砌体结构施工方案(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
砌体结构施工方案(国外英文资料)

砌体结构施工方案(国外英文资料) The marketing center masonry construction plan Orders to record Engineering overview 2 Create a base 2 Preparation 2 Compile construction work procedure 2 Familiar with drawings and related documents 3 3 materials and equipment prepare 3 3.3.1 material preparation 3 3.3.2 machine tools ready for 3 Construction personnel enter training 3 3.3.4 quality plan 4 Masonry 4 Construction sequence and process flow 4 4 materials and equipment preparation 4 Construction project 5 4.4 masonry mass 10 Product protection 13 Safety civilization construction... 13 Engineering overview The name of the project: the first phase of the project (I) of the project, the marketing center of the project Project location: the village of mazar-liang, in the white border town of hengshan county, in the city of yulin in shaanxi province; Construction unit: zhongcoal shaanxi yulin energy chemical co., LTD. Supervision unit: sichuan kangli project management co., LTD. Construction unit: zhongcoal construction and installation group co., LTD Design unit: zhongcoal xi an design engineering co., LTD. Design description: This project issue for yulin-hengshan coal chemical projects (Ⅰ) engineering factory area marketing center before the main structure infilled wall masonry engineering, this project is a three layer reinforced concrete frame structure, the building main body height of 15.600 m, total construction area 3713.850 ㎡, building seismic fortification intensity is 6 degrees, palisade structure for filler wall masonry, adopting MU10 common sintered brick, MU10 sintered porous brick, MU3.5 non load-bearing hollow bricks, plus or minus 0.000 above are non load-bearing brick, mixed M7.5 mortar. MU10 solid brick, M7.5 cement mortar, More than 0.000 filler wall is used for toilet, bathroom wall, pipe well partition wall, and non-bearing sintering brick for inner and outer filling wall. Compile evidence Construction drawings of construction and construction. 2.2 specifications and s

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档