- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
《修建施工组织》第03章在线测试(国外英文资料)
《建筑施工组织》第03章在线测试(国外英文资料)
Construction construction organization chapter 03 online testing
Chapter 03 online testing of the construction organization
Remaining time:
59:54
The top of the form
? 1, this volume is 20 points out of 20.
??????????????? After you finish the question, please make sure to click the hand in hand button, or you will not be able to record the results of the paper.
??????????????? Dont refresh the page before you hand it in, otherwise your answer will be empty.
1, 1, 1, 1, 5, 5
? The wrong answer about critical work and critical wiring is ().
A, the work with the least jet lag is the key job
B, no virtual work on the key line
C, the work on the critical circuit lasts the longest
Work on key lines is critical
? When the project period is equal to the computation period, the work () of the completion node of the critical node.
A, total time difference equals free jet lag
B, the earliest start time is the latest start time
C, it must be the key job
D, the free jet lag is zero
? The virtual work in the double code network graph is ()
A, both consuming time and consuming resources
B, only time, no resources
C, only resource consumption, not time consuming
D, neither waste time nor consume resources
? The following description of the two codenamed network graph drawing rules is incorrect ()
No loops are allowed
There can be a double arrow connection between the nodes
No arrows, no arrows, no arrows
No arrows node number is greater than arrow node number
? When the engineering network plan is more than the required period, the basic method to optimize the period of construction is ().
A, reduce the time interval between adjacent tasks
Shorten the duration of critical work
C, reduce the time interval between adjacent tasks
D, shorten the total time difference of critical work
Problem 2, multiple choice questions (2 points for each question, 10 points for 5 questions)
? In the scheme of engineering double codename, the earliest time to complete a task
您可能关注的文档
最近下载
- 广东长大美国科来福道路预防性养护和桥梁无缝伸缩缝系统工艺.pptx VIP
- 九年一贯制学校管理.pptx VIP
- 人力资源服务公司章程(申请人力资源许可证参考用).pdf VIP
- 四川大学生物医学工程基础课件.ppt
- 马克思的剩余价值理论课件(PPT 33页).ppt VIP
- SOC-OCV电池测试报告.docx VIP
- 纯化过滤专题报告之一:离子交换与吸附树脂行业报告,纯,现代工业生产中极致的魅力.pdf VIP
- 人类辅助生殖技术和人类精子库伦理原则.doc VIP
- 投标项目总体架构及技术解决方案.docx VIP
- 高二奋发+勇攀高峰+课件--2025-2026学年高二上学期开学第一课主题班会.pptx VIP
文档评论(0)