《修建施工组织》第03章在线测试(国外英文资料).docVIP

《修建施工组织》第03章在线测试(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
《修建施工组织》第03章在线测试(国外英文资料)

《建筑施工组织》第03章在线测试(国外英文资料) Construction construction organization chapter 03 online testing Chapter 03 online testing of the construction organization Remaining time: 59:54 The top of the form ? 1, this volume is 20 points out of 20. ??????????????? After you finish the question, please make sure to click the hand in hand button, or you will not be able to record the results of the paper. ??????????????? Dont refresh the page before you hand it in, otherwise your answer will be empty. 1, 1, 1, 1, 5, 5 ? The wrong answer about critical work and critical wiring is (). A, the work with the least jet lag is the key job B, no virtual work on the key line C, the work on the critical circuit lasts the longest Work on key lines is critical ? When the project period is equal to the computation period, the work () of the completion node of the critical node. A, total time difference equals free jet lag B, the earliest start time is the latest start time C, it must be the key job D, the free jet lag is zero ? The virtual work in the double code network graph is () A, both consuming time and consuming resources B, only time, no resources C, only resource consumption, not time consuming D, neither waste time nor consume resources ? The following description of the two codenamed network graph drawing rules is incorrect () No loops are allowed There can be a double arrow connection between the nodes No arrows, no arrows, no arrows No arrows node number is greater than arrow node number ? When the engineering network plan is more than the required period, the basic method to optimize the period of construction is (). A, reduce the time interval between adjacent tasks Shorten the duration of critical work C, reduce the time interval between adjacent tasks D, shorten the total time difference of critical work Problem 2, multiple choice questions (2 points for each question, 10 points for 5 questions) ? In the scheme of engineering double codename, the earliest time to complete a task

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档