地下室回填土(国外英文资料)
地下室回填土(国外英文资料)
2006, 10, 3
HuaXinYuan
Decorate a project
The basement is reclaimed
One, backfill preparation
Soil and mechanical preparation
Backfill soil is the source of the project department is responsible for the contact to the construction site, the quality of backfill soil should meet the requirements of the specification or the construction design must not contain any impurities such as living garbage, organic matter content must not exceed the norms. The particle size is not greater than 50mm, the moisture content should meet the requirement. Simple inspections on the scene to deal with the moisture content of soil, inspection method, with the hand can hold soil together and fall to the ground can bloom can determine the moisture content of soil basic can meet the requirement of the backfill.
Main machine: frog ramming machine, handcart, iron rake, spade, two meter scraping ruler, construction line etc.
Pay attention before backfilling
The rubbish should be cleaned and cleaned thoroughly before returning.
Clean up the water in the basement and observe if there is a leakage. If there is a leakage, the project department shall be organized by the project department. The completion of the sealing shall be checked and checked by the quality organization, and the procedures for concealment and acceptance shall be completed, and the refill may be carried out in the rear.
Two. Operation process
Process flow
The base of the foundation pit is cleared up to check the soil quality, the layer of the soil, the level of the soil, the smooth and the compactness, the inspection of the compactness, the smoothness, the leveling, the acceptance.
Backfill elevation control
Backfill soil must be strictly control its elevation, 1 # 4 # floor basement of backfill soil compaction is achieved after its surface elevation for 58 cm down from the structure of 1 meter, backfill soil elevation allowed error of 20 mm.
considerations
Before filling in the soil, you should clean up the ru
您可能关注的文档
最近下载
- 六年级下册总复习《比和比例》说课稿.pdf
- (2023正式版)JBT 14355-2023 发动机尾焰测温用钨铼热电偶丝 .docx VIP
- 骨架油封结构型式标准用途..docx VIP
- 2024第六届(2024年)“信用电力”知识竞赛活动总试题库资料-上(单选题汇总).pdf
- (完整word版)全新版大学英语综合教程4课文原文及翻译.pdf VIP
- 京能集团招聘笔试题库2023.pdf
- 抗震支架施工方案.doc
- 代买车辆协议书(精选5篇).docx VIP
- USP 1207.1 包装完整性和测试方法选择(中英对照).doc
- 山西梅园许村煤业有限公司120万ta矿井兼并重组整合项目环境影响报告书(公示版)-副本.doc VIP
文档评论(0)