- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
屋面结构柱混凝土缺点处理计划(国外英文资料)
屋面构造柱混凝土缺陷处理方案(国外英文资料)
catalogue
It is an introduction to the project. 1 ~ 2
The concrete defects are prepared for the preparation of the construction... 2 ~ 4
3, the processing principle of the quality defects of concrete and the processing requirement...... 4 ~ 5
The cause, treatment and prevention measures of the quality defects of concrete... 5 ~ 9
The quality assurance measures...... 10
Safety precautions... 11
Civilization and environmental protection measures... 11
Concrete quality defect scheme
Engineering profile
1.1 engineering overview
Project name: xinlihua city (phase 2) 18 #, building
Engineering address: 3 li 1 in xixiang tong district, nanning city.
Construction unit: guangxi xin lihua real estate development co., LTD
Design unit: fujian sanye architectural design co., LTD
Supervision unit: guangxi yijian project construction supervision co., LTD
Construction unit: donglin construction engineering co., LTD. In fujian province
The total area of the project is
18 # building: the ground with a total construction area 11086.91 ㎡, building covers an area of 1567.48 ㎡ building the ground for 11 layer, building a total height of 31.700 m, the function layout for a layer for business store, parts as the motor vehicle parking lot, two to eleven layer are residential. The upper structure is reinforced concrete frame structure, the main structural form is the frame shear structure, and the static pressure pile foundation is adopted.
1.2 general profile
The concrete defects such as the honeycomb, the surface, the rib, the cavity, the vertical and the vertical deviation of the structure of the concrete structure are easy to show in the concrete structure. In order to better deal with concrete defects, the project quality is guaranteed, and the scheme is specially designed.
1.3 basis
The current construction quality acceptance standards, compulsory standards and technical procedures for construction operation of the state. Complete set of architectural standards
您可能关注的文档
- 大工13秋《修建资料》指点资料十一(国外英文资料).doc
- 大工13秋《修建施工》在线功课2及谜底(国外英文资料).doc
- 大工13秋《土木工程概论》谜底3(国外英文资料).doc
- 大工13秋《工程项目治理》在线功课2谜底(国外英文资料).doc
- 大工13秋《工程力学(一)》在线功课3(国外英文资料).doc
- 大工13秋《工程抗震》在线功课1,2,3(国外英文资料).doc
- 大工13秋《高层修建结构》在线功课1,2,3(国外英文资料).doc
- 大工14春《房地产开辟与运营》在线功课3谜底(国外英文资料).doc
- 大工13秋《工程项目治理》在线功课3谜底(国外英文资料).doc
- 大工14秋《修建制图》课程鸿文业题目谜底(国外英文资料).doc
- 2019年上海市静安区高考化学二模试卷 解析版 .pdf
- 2019-2020年七年级数学下册第五章生活中的轴对称5.3简单的轴对称图形教.pdf
- 机电一体化实习报告1500字(精选7篇) .pdf
- 机械工程师年度工作总结及工作思路(最新版) .pdf
- 2019苏科版九年级物理上册单元测试(含答案)第11章 简单机械和功单元培.pdf
- 机械配件工程制动鼓生产项目建设可行性研究报告 .pdf
- 江苏省淮安市淮海中学2017届高三历史下学期第二次阶段性测试试题(含.pdf
- 1.山东电力集团公司生产技术改造工作管理实施细则(试行) .pdf
- 机械密封产品项目研究分析 .pdf
- 2020年九年级中考数学 压轴专题 几何探究题(含答案) .pdf
文档评论(0)