卒业功课二题目(2014春届)(国外英文资料).doc

卒业功课二题目(2014春届)(国外英文资料).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
卒业功课二题目(2014春届)(国外英文资料)

毕业作业二题目(2014春届)(国外英文资料) This paper describes the methods, applicable conditions and the main points for the treatment of foundation in at least four guangdong areas. A: (1) change the padding method Applicable conditions: for shallow soft foundation and uneven foundation treatment. The main points of the construction are sand, sand, soil, ash and fly ash. When well-founded or successful experience, also can use other hard, stable performance, strong water permeability, non-corrosive material, but must go through field test can be applied. (2) the dynamic compaction method Applicable conditions: the compaction method is suitable for the treatment of loose gravel soil, sandy soil, low saturation powder soil and viscous soil, soil filling and mixed soil. Construction points: before the construction of compaction, the construction site should be selected at the site of the construction site, and then the construction of a representative test area should be chosen. The measurement datum should be located outside the scope of the construction impact. The compaction location allows the deviation to be no greater than The plus or minus 50mm, and the tamper should be clearly marked and numbered. The number of test areas shall be determined according to the complexity of the building site, the size of the building and the type of construction. When the same or similar geologic condition, engineering technical requirements and the existing mature dynamic compaction construction experience, can undertake special pilot trial ramming not, but in the overall dynamic compaction construction should be in small pieces before trial ramming. As produced by the vibration of dynamic compaction construction approaches built, materials or equipment will produce harmful influence, should set up the monitoring stations, and take to dig isolation trench isolation or vibration control measures. (3) vibration crushing pile method Applicable conditions: this method is suitable for the treatment

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档