- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
卒业功课二题目(2014春届)(国外英文资料)
毕业作业二题目(2014春届)(国外英文资料)
This paper describes the methods, applicable conditions and the main points for the treatment of foundation in at least four guangdong areas.
A: (1) change the padding method
Applicable conditions: for shallow soft foundation and uneven foundation treatment.
The main points of the construction are sand, sand, soil, ash and fly ash. When well-founded or successful experience, also can use other hard, stable performance, strong water permeability, non-corrosive material, but must go through field test can be applied.
(2) the dynamic compaction method
Applicable conditions: the compaction method is suitable for the treatment of loose gravel soil, sandy soil, low saturation powder soil and viscous soil, soil filling and mixed soil.
Construction points: before the construction of compaction, the construction site should be selected at the site of the construction site, and then the construction of a representative test area should be chosen. The measurement datum should be located outside the scope of the construction impact. The compaction location allows the deviation to be no greater than
The plus or minus 50mm, and the tamper should be clearly marked and numbered. The number of test areas shall be determined according to the complexity of the building site, the size of the building and the type of construction. When the same or similar geologic condition, engineering technical requirements and the existing mature dynamic compaction construction experience, can undertake special pilot trial ramming not, but in the overall dynamic compaction construction should be in small pieces before trial ramming. As produced by the vibration of dynamic compaction construction approaches built, materials or equipment will produce harmful influence, should set up the monitoring stations, and take to dig isolation trench isolation or vibration control measures.
(3) vibration crushing pile method
Applicable conditions: this method is suitable for the treatment
您可能关注的文档
- 思易达教导2014岁首年代二数学暑假试题(国外英文资料).doc
- 急性肾毁伤临床门路(国外英文资料).doc
- 总规 控规 修规(国外英文资料).doc
- 恒智天成平安计算软件吊挂式吊篮计算书(国外英文资料).doc
- 悬挑板结构计算说明(新标准)(国外英文资料).doc
- 悬架是汽车的车架与车桥或车轮之间的一切传力连接装配的总称(国外英文资料).doc
- 悬索桥主缆及吊杆制作(国外英文资料).doc
- 悬索桥上部结构施工计划(国外英文资料).doc
- 悬索桥施工平安操纵要点(国外英文资料).doc
- 悬索桥的计算方法及其过程1(国外英文资料).doc
- 第16讲重难点拓展不等式恒成立能成立问题(三大题型归纳分层练).docx
- 全国注册资产评估师考试辅导教材编写组,资产评估学中国财政经济出版社,;.pptx
- 人教版初中美术七年级下册附录二美术资源链接课件.pptx
- Unit9HaveyoueverbeentoamuseumSectionB1a1d课件人教版八年级英语下册.pptx
- Unit2Lesson11ShoppinginBeijing(课件)冀教版英语五年级下册.pptx
- Unit1KnowingmeknowingyouListeningandSpeaking课件-高中英语2【05】.pptx
- Module6Unit1Happybirthday!(课件)英语三年级上册(9)2(精)4.pptx
- 一年级小学生下册数学训练题及答案.docx
- 丰富小学数学模拟实际生活中的应用问题.pptx
- 中国法制转型期的“权利观”考察.pptx
文档评论(0)