工程初步落成验收请求1(国外英文资料).docVIP

工程初步落成验收请求1(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程初步落成验收请求1(国外英文资料)

工程初步竣工验收申请1(国外英文资料) An application form for the preliminary completion of the project Project name: number: To the project supervisor department: We have completed the project in accordance with the contract requirements, the company self acceptance, please give the preliminary completion inspection and acceptance. Attachment: Self-examination report. Contracting unit (chapter) : Project manager: Date: Project supervisory department review comments: Project supervisor (chapter) Chief supervising engineer: Date: In the form of three copies of this table, the contracting units shall fill in the units, the units of construction and the supervision units, and the units of the contracting units. Report on the acceptance of project completion First, the completion of the project: * * * and consolidate the reservoir engineering project was approved by the provincial, municipal departments, approved a total investment of 10.06 million yuan, including: national debt capital investment of 7 million yuan, the local matching funds of 3.06 million yuan. The reservoir and the main content of reinforcing dam as follows: (1) before the dam, dam slope above 1563 elevation to block stone, strengthening the upstream dam slope, in the left dam abutment walls and spillway on the right side wall contact area of tooth after add a concrete cut-off wall; To strengthen spillway and downstream channel management; Replace the arc door and the door of the panel, and replace the door opening and closing machine. To improve the dam and the entrance of the highway; The installation of dam observation facilities and automatic control system are added. Engineering construction began on May 31, 2001, 2002 fully completed by the end of June, after 13 months, and consolidate engineering according to the approved design scheme has been completed the main engineering, namely: the completed before the dam dam slope reinforcement engineering; The reinforcement of the spillway and the management of the dow

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档