- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
新产品靠得住性评审步调和方法(国外英文资料)
新产品可靠性评审步骤和方法(国外英文资料)New product reliability review steps and methodsReliability design reviewThe need for reliability design reviewsSo-called reliability design review, you are at a certain stage in the process of product design or in design was basically completed, organize relevant aspects of professional and technical personnel, to review and evaluation of reliability design work. It is the wisdom of the collective to make up for the shortcomings of the designers, and make the design plan and content more reasonable and perfect. Therefore, it is a necessary management content of the reliability design process and an effective and economical measure to improve reliability further.2. Review the job(1) the audit team leader: review plan, determine or work out all the assessment criteria, when necessary, organize the inspection personnel training, organization necessary to review the resources, division of labor, to ensure that formal review well-prepared, distribute to review documents, review meeting be convened and presided, report to the relevant leaders, evaluation results and tracking evaluation error correction.(2) the reviewers: when it is necessary to review related training, reading to review material according to the plan of review, ensure to review the understanding of the material, the authors discuss and to review the materials, and points out problems and record.(3) new product designers: according to the inspection plan to prepare and submit for review materials or review the prototype, necessary materials for interpretation, and to participate in the review meeting, and in determining the need to improve when finish the modification.(4) record personnel: review the questions raised by the judges during the review meeting and the relevant discussion.(5) project manager: ensure that the review and correction plan to the project schedule, also want to make sure I have time to review, review meeting time and error correction. The review arrangement and
文档评论(0)