柱板混凝土浇筑平安及交底(国外英文资料).docVIP

柱板混凝土浇筑平安及交底(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
柱板混凝土浇筑平安及交底(国外英文资料)

柱板混凝土浇筑安全及交底(国外英文资料) Check the concrete with a high standard, and then scrape it flat with a ruler. Use the spatula in the construction seam or in the embedded parts and the inserts. Concrete is not allowed to be spread by vibratory rod. (5) position of the construction; The construction seam should be placed in the middle 1/3 range of the secondary beam span. The surface of the construction shall be perpendicular to the axis of the beam or the page and not to be left. The construction seam should be secured by boards or steel wire mesh. (6) when the compressive strength of the concrete is not less than 1.2 mpa, it is allowed to continue pouring. Before continue pouring concrete, construction joints of concrete surface should be cut hair, remove the floating stones, and after the water is clean, to a layer of cement slurry, and then continue pouring concrete, should meticulous manipulation vibrated, the old and new concrete. Shear wall concrete: (1) casting wall concrete should be continuous, interval time should not be more than 2 h, each casting thickness control in 60 cm, must therefore be arranged in advance under the concrete material point location and number of vibrator operator. (2) the vibrating rod mobile spacing should be less than 40 cm, each point of the duration of vibration in surface laitance degrees, to enable the lower level of concrete combined into a whole, 5 cm should be inserted into the lower concrete vibrator. It is necessary to vibrate on both sides of the hole to prevent leakage, and the ash height should be broadly consistent. The bottom template of the big hole should be opened and vibrates here. (3) after the concrete wall is finished, the steel bar that will be dumped from the top will be cleaned up, and the concrete will be flattened on the high line by the wooden float 8, stair concrete pouring: (1) flight from top to bottom pouring concrete, first vibrated concrete floor, reach a step position again with step concrete casting, conti

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档