- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水电站修建物(国外英文资料)
水电站建筑物(国外英文资料)
One, one, the largest hydropower station built: the itaipu hydropower station, built by Brazil and Paraguay, has installed capacity of 12.6 million KW.
The largest hydropower station under construction: the three gorges dam. After the dam, there are 26 buildings, 6 on the right bank, and 700,000 kw. In the other plant, the machine is installed in two machines, which is 50,000kw. So the total installed capacity of the three gorges dam was 22.5 million kw.
The largest hydropower station planned: the ink dewatering plant on the yarlung zangbo river, which can reach 40 million kW if it USES 40km of water diversion tunnel.
4 hydroelectric power: the principle of the construction of hydraulic structures in natural river, on the head, then will the water to the turbine, make, and hydro turbine rotating mechanical energy to drive the generator transforms mechanical energy into electrical energy, transmission lines to the user.
The advantages of hydroelectric power (1) hydropower, which is renewable energy (2), run less, mainly by remote control; (3) be flexible; (4) to save coal, oil, natural gas and human resources; (5) the comprehensive benefits of flood control, navigation and irrigation are given. (6) pollution is small. The disadvantages of hydroelectric power generation (1) are difficult to build and transmit electricity. (2) large quantities of engineering and long working days; (3) causing the reservoir to be submerged and having a detrimental effect on the natural ecological environment. The reservoir area: submerged, landslide, reservoir, ecological change, water temperature, changes in water quality, meteorological changes, induced earthquake and sanitation deterioration. The downstream of the reservoir: the water clears the channel, the water changes in the original channel, the water temperature of the river, the water quality changes.
There is a pressure inlet position: the imported water flows smoothly, symmetrical, no reflux and vortex, no de