浅析剪力墙内预埋配电箱(国外英文资料).docVIP

浅析剪力墙内预埋配电箱(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅析剪力墙内预埋配电箱(国外英文资料)

浅析剪力墙内预埋配电箱(国外英文资料) Shallow shear wall embedded power distribution box Shan jian group first limited company announced the call Abstract: to set up the power distribution box in the shear wall, and the construction process is programmed and standardized. Keywords: once formed, box body positioning, use template correction, position reinforcement, 3 side. With the continuous development of economy in our country, the shear strength of the structure of the high-rise building gradually become the mainstream of construction, high-rise buildings, large and small, more than one hundred units, distribution box for construction equipment installation practitioners, how to streamline in the shear wall embedded distribution box is bound to become a key issue. Traditional installation method is the main body construction, made wooden frame according to the geometry size of distribution box reserved hole, after being main body construction finished, demolition of wooden frame, box installation, repair the mouth of the cave, there are many defects in the installation process. Make wooden frame, is bound to increase additional cost, and due to the stability of the wooden frame, poor impact resistance, easy to deformation during concrete casting, caused the reserved hole deformation, need to rebuild. Installing a box body, to take over the difficult, difficult to meet a hole a tube, pipe line up, even to use welding open hole, long open hole, cause the quality defects, after the installation is subject to civil engineering units to cooperate for the hole to fill repair, also left metope quality hidden trouble. Throughout the process, it takes time and effort to ensure the quality of the installation. The difficulty of pre-burying the power distribution box in the shear wall is that the demand for success rate is very high, and it is almost impossible to adjust when there is a problem. Industry in recent years there have been many about embedded in the shear wall distribution box,

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档