- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
溷凝土论文施工技巧论文:大体积溷凝土施工技巧办法(国外英文资料)
溷凝土论文施工技术论文:大体积溷凝土施工技术措施(国外英文资料)
Academic publishing and writing resource platform: QQ: 275252867
Technical papers on concrete paper construction: the technical measures of large-volume concrete construction
1. Introduction
Large concrete bottom plate, high strength grade concrete wall, column and the basement of girder and board. The construction technique of large concrete is very high, especially in the construction, to prevent the temperature difference caused by the concrete hydrating heat to produce the temperature stress crack. Therefore, it is necessary to make full preparation work from material selection, technical measures, etc., so as to ensure the smooth construction of the large concrete.
Construction method
2.1 template design
When the design of the template is designed, it is necessary to ensure the strength, stiffness and stability of the form. The maximum lateral pressure of the template is related to the main influencing factors such as the velocity of the concrete, the height, density, slump, temperature and admixture.
The pouring of the large concrete
(1) after the concrete pump is started, the pump will be pumped in the right amount of water to meet the contact part of the concrete pump, the piston and the inner wall of the conveyor tube. Confirmed by the pumping water, no foreign body in concrete pump and pipeline, the slurry, or 1:2 cement mortar, or with other ingredients the same except the coarse aggregate in concrete mixing ratio of cement mortar concrete pump lubrication and duct wall. The lubricated slurry or cement mortar should be dispersed and not be concentrated in one place. The concrete pump will be carried out continuously, and the hopper shall have enough concrete. If it must be interrupted, the time limit shall not exceed the duration permitted by the concrete from stirring to the pouring.
(2) large volume concrete pouring with 3-7 ㎝ stones, according to the concrete amount 20% - 20% added, casting by hierarchical segmentatio
文档评论(0)