项目管理 文本文档(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
项目管理 文本文档(国外英文资料)

项目管理 文本文档(国外英文资料) A, multiple choice The three main objectives of project management are (B) b. progress, quality, and cost control The following statements on the characteristics of the progress plan of the transverse chart are correct to (B) B. Applicable to the manual scheduling of the progress plan The monthly construction plan of the project and the program for the construction of the project are part A The sufficient condition for becoming a critical circuit in network diagrams is (C) The total time difference is zero, and the free jet lag is zero From the point of view of construction quality acceptance, the minimum construction quality acceptance unit is. (C) 6. The contractor shall, in accordance with the construction schedule approved by the supervisor organization, but due to the shortcomings of schedule delays, the liability shall be borne by (A) a. contractors In the form of the following construction contract, the contractor shall bear the total amount of engineering and the risk of price (B) b. fixed total price contract The composition of the dicodename network graph does not include (A) a. the interval of working hours The goal of network planning optimization is (C) C The earliest start of a job is the first (B) B The project proposal belongs to the life cycle (A) a. decision stage of the construction project The organizational pattern reflects the (D) D. Instruction relationship between the sub-systems in an organization system or between elements The construction enterprise project manager is the director of the D project management team In accordance with the terms of the general contract in the standard construction tendering documents, the contractor shall not change the project without authorization. supervisor The decisive factor in the quality management of project construction is (A). A. people The task of the owners project schedule control is to control (B) progress. The entire project implementation phase One of the hallmarks of the pla

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档