35KV变电所母线清除平安技巧办法2(国外英文资料).docVIP

35KV变电所母线清除平安技巧办法2(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
35KV变电所母线清除平安技巧办法2(国外英文资料)

35KV变电所母线清扫安全技术措施2(国外英文资料) The electric circuit of wangjiawan is notified by the bureau of electricity. 6, after all, in the no. 2 main transformer 35 kv line into the wall casing on three-phase bus bar grounding short circuit, in the second paragraph on the bus is a bus a meters, from a Wang Wan line into line one meter each hang a link to a short route. On the lightning rod, the up and down CARDS are placed on the lightning rod, and the construction personnel must go up and down, strictly forbidden from other places. A no crossing card is hung from a single line of bus on the second line. The oil switch on the upper end of the oil switch is on the end of the line with electrical hazard card, which is specially monitored by the special person, and no one is allowed to open the lid or enter into the tray on the 305 oil switch. 10, construction head checked out the confirmation after completion of safety work, to allow workers began cleaning the bus, work contents are as follows: cleaning the busbar, clean bus support porcelain, oil switch, all handcart on a bus, check the oil switch, oil shortage of oil, oil switch all the fastening screw fastening again, busbar connection part of the conductive paste. 11, after completion of all work, by the construction, inspection, head of all staff, has pulled out of touch without any charged part, no any tool left on the bus, contact substation attendant, attendant check without any security hidden danger, to withdraw from all three phase short circuit grounding line, and then by the construction, check and correct all, head of sending a test run. Order: 1) contact authority to inform the wangji-zhai 110KV substation of the wang bay line to pull out of the ground wire. 2) push the 305 oil switch to the sending position and deliver the 305 switch. Switch the 302 oil switch to the location of the power supply, and close the 302 switch. 4) push the 304 oil switch handcart, 602 oil switch handcart to test location. During the clea

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档