- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
9860计算器(国外英文资料)
9860计算器(国外英文资料)
After months of hard study, I develop the universal 3 d coordinate calculation program (for 9860 series folding graphing calculator, and casio casio graphing calculator) is finally completed.
The all-around 3d coordinate calculation program developed by myself is adaptable, and it is suitable for the terrain, construction, road, road, pipeline and ditch etc. Program the core is the general integral program, published online in the line, it adapt to all kinds of line line, line and complete easement curve, nonholonomic easement curve and curve, s-shaped curve, egg type curve, complex curve by all sorts of complex curve line element combination.
The line element integration program is in the program that I developed, the line element input, the coordinate is calculated, the coordinate is the inverse, the tunnel is overowing the excavation is in the application.
I develop all-round three-dimensional coordinates calculation procedures with complete function and the topographic survey, construction steel, stratification of the subgrade measurement, oblique, ultra high pay-off, widen, slope, tunnel overbreak, etc all can use, you only need to run the program in according to the prompt for the corresponding parameters of the program to run the corresponding function.
Building pay-off you only need to online yuan yuan RMB according to the linear input line in the input data, K + is, are you sure the longitudinal building pay-off direction distance - C is corresponding to the horizontal distance, after the operation can display the pay-off data you need level Angle of Hr and the horizontal distance HD. You need to do is to set up the instrument in the data to you set the building origin (N = 0, E = 0) coordinate data input.
I developed the all-around three-dimensional coordinates program,Road widening and ultra-high performed within the gentle curve segment, widen the curvature change according to the four curve formula, high curvature changes according to t
您可能关注的文档
- 2013年福建省公务员面试真题(国外英文资料).doc
- 2013年全国环境安全大检查现场检查表(国外英文资料).doc
- 2013广西工程量计算规则(土石方工程)(国外英文资料).doc
- 2013最新奢华婚礼背景音乐推荐(国外英文资料).doc
- 2013滨州市继续医学教育项目学习恶性脑胶质瘤的综合诊疗(国外英文资料).doc
- 2013级职业生涯规划考试(国外英文资料).doc
- 2013走向高考,贾凤山,高中总复习,地理,3-3-2(国外英文资料).doc
- 2013年新增游艺厅场所审批管理细则(国外英文资料).doc
- 2013越野赛方案(国外英文资料).doc
- 2013输电线路定额学习(国外英文资料).doc
原创力文档


文档评论(0)