- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
9完工决算(国外英文资料)
9竣工决算(国外英文资料)
1, the role of the completion inspection and acceptance: construction of comprehensive evaluation results, check the design, the quality of the project is in line with the requirements, to ensure that construction projects according to the design requirements of the technical and economic indexes of normal use; To summarize the experience of project construction and provide basis for improving the projects economic efficiency and management level; It is the last program of the implementation phase of the project, which is the mark of the development of the construction and the use of the production. Turn into the necessary part of the operation.
Completion acceptance conditions: complete the design and the contents of the contract agreement, and meet the requirements for use; Having complete technical archives and construction management materials; Report on the entrance test of the main building materials and equipment used by the project; Having the quality qualified documents signed by survey and design construction supervision; The developer shall pay the project in accordance with the contract; The quality assurance books signed by the contractor; All the problems were completed; To be completed in accordance with the approved design documents; After the foreign import of the project, the equipment shall be completed in accordance with the contract and the requirements for the completion of the inspection of the load test, and shall achieve the fixed technical and economic indicators; Some other project and a few finishing stipulated in the design of content not completed, but does not affect the normal production and use, for the rest of the project shall be in accordance with the design standing investment.
The construction energy saving project is a branch project of the unit construction project, the unit project completion inspection and acceptance should be carried out after the construction energy saving is not enough.
The completion of th
您可能关注的文档
- 2013年全国环境安全大检查现场检查表(国外英文资料).doc
- 2013广西工程量计算规则(土石方工程)(国外英文资料).doc
- 2013最新奢华婚礼背景音乐推荐(国外英文资料).doc
- 2013滨州市继续医学教育项目学习恶性脑胶质瘤的综合诊疗(国外英文资料).doc
- 2013级职业生涯规划考试(国外英文资料).doc
- 2013走向高考,贾凤山,高中总复习,地理,3-3-2(国外英文资料).doc
- 2013年新增游艺厅场所审批管理细则(国外英文资料).doc
- 2013越野赛方案(国外英文资料).doc
- 2013输电线路定额学习(国外英文资料).doc
- 2014 政府与非盈利组织会计 三 答案(国外英文资料).doc
最近下载
- ASUS华硕主板大师系列Z97-A 用户使用手册 (繁体中文).pdf
- 现代农业创新与乡村振兴战略智慧树知到答案章节测试2023年华南农业大学.pdf VIP
- CVC非计划性拔管不良事件RCA分析与PDCA项目报告.pptx
- 部编版六年级上册第26课《好的故事》教学设计(教案).docx VIP
- 《蛋白质构象病》课件.pptx VIP
- 正方体的表面积(优秀 ppt课件).ppt VIP
- 《丝绸之路的传奇历程》课件.ppt VIP
- 2025年贵州省面向优秀村(社区)干部专项招聘乡镇(街道)事业单位工作人员历年参考题库含答案详解.docx VIP
- 部编版六年级上册第26课《好的故事》一等奖教学设计(教案).doc VIP
- 《海蒂》读书心得体会.pptx
原创力文档


文档评论(0)