- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
CASS7.0计算两期土方题目(国外英文资料)
CASS7.0计算两期土方问题(国外英文资料)
CASS7.0
meter
calculate
two
period
soil
party
Measurements are often calculating earthwork problems, two phase of earthwork calculation is one of the distinctive features of CASS, earthwork balance construction process, especially the area or measured the two results, it can be a one-off excavation earthwork quantity for us to calculate the same area of fill, is very convenient. In order to give you an in-depth understanding of the methods of CASS6.1 calculation of two soils, this question is discussed to discuss learning.
???? In general, the following three methods can calculate two periods:
????????? Between the two sections of the line
????????? 2, the DTM method is calculated in two terms
????????? Square grid (design surface for triangle)
Triangulation method, grid method is a common method of section method is provided to party as volume basis, generally three methods to calculate the gap is not going to more than 2% - 5%.
Triangle method count: click the contour line, choose to establish DTM or surface DTM perfect
Click create DTM and display:
???????????
The selection is generated by the surface elevation point, determined.
Notice the text in the lower left corner, and click the enter button. When you select the boundary line of the area, you will automatically form the triangle network, as shown in the picture:
After the triangle network is formed, click on the DTM method in the application of the project to calculate the amount of soil, and select the triangle net on the graph, as shown here:
When selected, the following image will appear:
Note the tip at the bottom left: enter the level-field height (which is the depth of the design, usually with a depth of 0.5 m), which will be displayed in the lower left corner. The square measure is done.
???? Square grid method calculating square method: the square grid method calculates the square method to calculate the quantity first, click the project to use the mouse down, select the spe
您可能关注的文档
- 2014试卷(国外英文资料).doc
- 2015会计继续教育试题 2015.12.17(国外英文资料).doc
- 2014年公需科目信息安全知识、科研方法与论文写作答案(国外英文资料).doc
- 2015内蒙古事业单位口试备考:口试真题解析九(国外英文资料).doc
- 2015军转政策:军队转业复员干部滞留部队有关问题处理办法(国外英文资料).doc
- 2015吉林省公事员测验申论热门:“旅客滞留”面前难掩治理之惑(国外英文资料).doc
- 2015咨询工程师继续教育地基处理答案(国外英文资料).doc
- 2015国家公务员面试真题【外交部面试题四】(国外英文资料).doc
- 2015届江苏苏州园区高三年级联考试卷数学试题(2015.4.24)(国外英文资料).doc
- 2015年xx县村庄饮用水监测计划(国外英文资料).doc
原创力文档


文档评论(0)