- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
 - 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
 - 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
 - 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
 - 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
 - 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
 - 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
 
                        查看更多
                        
                    
                企业管理实务第三章测试答案(国外英文资料)
                    
企业管理实务第三章测试答案(国外英文资料)
One, single choice?? (5 points for each question, 15)
The key to the implementation of SEIRI is the display of items () on site. (5 points)
clean
classification
logo
Clean the
The following targets that do not belong to the JIT are (). (5 points)
The number of flexible configuration jobs
Just-in-time production
Quality assurance
Work together to
The following production management method is not originated in Japan (). (5 points)
5 s management
JIT
Kanban management
Agile manufacturing
The following are not the three elements of reorganization (). (5 points)
Place place
Placement method
Identification method
Space layout
5, the preservation of the article should follow the principle of three definite, which of the following does not belong to the content of three definite? () (5 points)
Fixed point
timing
quantitative
Constant volume
6, visual management should make the display signal clear, the position is appropriate, the scene personnel can see, see clearly, this is to follow () request. (5 points)
unified
contracted
bright
practical
7, a pipelining production before the end of the day, after the process of cleaning machine, a dont stay for the night, the second day production starts, after the process is in standby state, with nothing to do, cause tight end loose head. This is an assembly line problem. (5 points)
With no
There is no point
Dont talk to point
Full load
The goals of agile manufacturing do not include (). (5 points)
The production technology
management
The human resources
time
The core idea of agile manufacturing is (). (5 points)
flexible
technical
Flexible management
Mass customization
10, scrap machinery, equipment, cant repair the mold, all kinds of material of empty barrels, cans, bottles, expiration of electronic components, etc., we can use () method. (5 points)
Landfill disposal
sell
Burn treatment
Transfer process
Installation in the door of the elevator or the entrance to the workshop, which includes the location map 
                您可能关注的文档
最近下载
- Bim实际工程应用案例.pptx VIP
 - 专职队消防员合同范本.docx VIP
 - 大中型企业安全生产标准化管理体系要求.docx VIP
 - 5.1十字花科蔬菜病虫害(课件)-高一《植物保护技术》同步教学(中国农业出版社).pptx VIP
 - DB1405∕T 013-2021 大豆种植技术规程.docx VIP
 - 强直性脊柱炎临床路径.doc VIP
 - 中国的河流滔滔黄河课件八年级地理上学期湘教版.pptx VIP
 - 消防廉政警示教育.pptx VIP
 - 第4课《用联系的观点看问题》第2框《在和谐共处中实现人生发展》-【中职专用】《哲学与人生》同步课堂精品课件.pptx VIP
 - 臀诊专业知识课件.pptx VIP
 
原创力文档
                        
                                    

文档评论(0)