全线涵洞施工要求(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
全线涵洞施工要求(国外英文资料)

全线涵洞施工要求(国外英文资料) Technical record form No. : Name of the entity The culvert technology is at the bottom of the line Disclosure of Review one Date of disclosure Bottom department and personnel: The details of the bottom line: The specific contents of the annex 1 and the full line culvert construction requirements Annex ii, culvert technology is in the background Information on the bottom of the line (whether there is any problem) : Accessories: full line culvert construction requirements The culvert technology is at the bottom of the line All of the construction requirements for the culvert A, templates, 1, the cover plate cast-in-situ slab culvert, its foundation, wall body (including import and export side wing wall) and flat bottom die using large steel template, single block template area of not less than 1 ㎡. 2, all adopt large steel formwork frame culvert, single block template area of not less than 1 ㎡. 3, round GuanHanHan finalize the design template is the site prefabrication, import and export side wing wall using large steel template, the single block template area of not less than 1 ㎡. Second, the time limit for a project All the construction period must be completed by the end of July. The culvert technology is at the bottom of the line A basis, Construction preparation Before foundation excavation, temporary facilities, power, lighting, security facilities, construction equipment must enter the scene, and clear the surface tillage planting soil, flat area, remove obstacles, label processing range. After the preparation work, the field technician will inform the project department to set the sample. Out after the completion of the project department metering, construction group, according to metering lofting culvert axis and the direction of the pile, combining with the culvert drawings and consider put slope, with marked with white excavation contour line. The excavation of the excavation is calculated. The culvert pit excavation (1) drainage of the su

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档