南水北调配套廊道土方开挖施工方案(国外英文资料).docVIP

南水北调配套廊道土方开挖施工方案(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
南水北调配套廊道土方开挖施工方案(国外英文资料)

南水北调配套廊道土方开挖施工方案(国外英文资料)In henan province, the water supply of zhengzhou, the water supply of zhengzhou, was excavated by the land of 20shiworkpartycaseZhengzhou water service construction engineering co., LTDIn henan province, the water supply of zhengzhou is a supporting projectConstruction 10 mark section 20In henan province, the water supply of zhengzhou is a supporting projectConstruction 10 mark section 20The earthwork excavated the construction planFirst, the general situation of the projectEntrance to the airport 20 a waterworks water supply pipeline across the centerline of the main canal within 94.42 m downstream of the river liu bleeder door, orthogonal to the ZhuGanQu axis, intersection geodetic coordinates X = 3827904.261, Y = 488232.016, intersections in the design of the main canal pile of SH (3) 166 + 233.22. Through the use of the main canal inverted siphon form corridor, the import and export inspection Wells, oblique section and horizontal section of horizontal section of the corridor on the top of and main canal canal bottom distance of 2.0 m. The corridor is made up of two 18m long pipe sections at the bottom of the channel, which consists of three 12m (horizontal projective length) inclined tubes, and the slope of the inclined tube is 1:6. The water pipeline runs through the box and USES the DN1800 steel pipe.One, the earth square digConstruction preparation(1) survey the scene, clear the ground and the obstacles on the ground.(2) to protect and measure the benchmarks to ensure the location and size of the excavation are accurate and correct.(3) for excavating machinery, personnel, construction electricity, water, roads and other facilities.2, clearance,All project within the scope of the surface layer of weeds, stone, sundry, roots, humus soil shall be in addition to clean, such as formation compaction, thickness should not less than 0.3 m, not anywhere the discarded waste residue, cleared out by dump truck outbound to abandon the field.The ea

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档