地下水位操纵计划(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
地下水位操纵计划(国外英文资料)

地下水位控制方案(国外英文资料) And yuan park family business community The first phase of to Under the water a control system party case The southern star of the lake was built with limited company On September 21, 2001 Water table control scheme One, engineering situation: This project for project and far park family in the basement, the basement floor top surface elevation of 31.5 meters, according to the construction site ground elevation measurement, its average construction ground elevation 31.60 meters, the elevation of 36.90 meters, 0.000 mm cap most foundation pad bottom elevation of 30.1 meters. In the underground water level is low, estimates the water inflow is not big, but there are 2 meters thick rubbish backfill layer, the moisture content is higher, in order to prevent groundwater based on buoyancy and damage the foundation, in accordance with the requirements of design and construction of the scene, excavation of the underground water level must be dropped below 7.5 meters. In order to save the cost, this project adopts the method of the water and dark drainage, the drainage of the open drain and the well point precipitation. Construction plans and methods: 1, the drainage of water in the water pit: In south east of foundation pit, open drain, set the drop in the pit of the north and west, between the 5 # floor and afterward casting zone on the west side, 5 # floor instead of the south after the location of the pouring belt between setting drainage culvert, and establishs an interchange of three Wells, make the foundation seepage of groundwater through open drains and drainage in the sump, and then use the water pump discharge outside the foundation pit. That can connect to drain all through the base of pile cap beam connected, away from the drain cap or deep pile caps, if bottom water cant row out, adopt Φ 100 sewage pump into the gutter, along with the row over withdraw. Drain practice: the basement caps before the earthwork excavation, first in 0.6 m3 excavato

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档