正循环技术交底(国外英文资料) Construction plan of bored pile construction (1) construction preparation 1, measuring position According to the design drawing, the specific hole position of the bored pile shall be released according to the coordinate system, and the identification shall be made. 2, land clearing, The ground should be leveled and cleared before construction, in addition to soft soil and compacted. The base of the rig should not be placed on a firm ground to avoid the uneven subsidence. Drilled pile ground plane size should be according to the size of pile foundation design of plane, the size of the drill rig substructure quantity and plane, drill shift requirements, construction methods and other construction machines and facilities arrangement, and so on and so forth. (2) construction techniques 1, choice of drilling rig The construction of the borehole piles is made of GW -50, ts-15 and ts-20. The production and embedding of the cylinder Protecting tube is made of six ㎜ thick steel plate production, its diameter is greater than the diameter of 0.2 ~ 0.4 m, each section 2 m high, embedding liners shall be higher than the ground 0.3 m. Liners plane position and the pier axis deviation is not more than 5 ㎝, vertical gradient is not greater than 1%. In order to facilitate the circulation of mud, the top of the barrel is 30cm high and 20cm wide. 3, mud preparation and mud pool layout The function of mud in drilling is: (1) the pressure of suspended fluid in the hole to prevent the collapse; (2) the leakage of mud to soil layer outside the hole, in the process of drilling, due to the activities of the drill bit, hole wall surface to form a layer of cement, have breast wall effect, will flow in and out of hole cut off at the same time, the stability of hole water level; (3) than big slurry, with scum, conducive to drill the slag discharge, therefore in the process of drilling, hole be maintained a certain consistency of slurry, specific gravity is 1.1 to 1.3, the percus

文档评论(0)

1亿VIP精品文档

相关文档