[项目治理者联盟专稿]软件项目质量治理实战总结1(国外英文资料).doc

[项目治理者联盟专稿]软件项目质量治理实战总结1(国外英文资料).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
[项目治理者联盟专稿]软件项目质量治理实战总结1(国外英文资料)

[项目管理者联盟专稿]软件项目质量管理实战总结1(国外英文资料) The quality plan must also determine the effective quality management system, which is responsible for the quality of the project and the authority of quality managers at all levels. Deming circle (also known as PDCA circulation method) as an effective management tool widely used in the quality management, it adopts the plan, execute, check - measures the quality of the ring, in the quality plan quality ring each link must be clear to all responsible units, to ensure the effective implementation of the quality plan. Implement effective quality control according to quality plan After the quality plan is established, the quality control system shall be implemented according to the quality control system of the PDCA, and the effective quality control shall be carried out according to the requirements of the PDCA quality ring. Quality control should be throughout the whole process of the project, it can be divided into two phases, monitoring and control: the purpose of monitoring is to collect, record and report the data on the quality of the project information; Control is the use of data provided by quality monitoring to control and ensure that the project quality is consistent with the plan. In the process of quality monitoring, to the quality plan set in the witness point, stoppages for misconduct, quality monitoring personnel check measure in time according to operating procedures (including for shutdown for misconduct must be signed by the supervisors can enter into next working procedure after approval), to determine whether the project results (or results) to comply with relevant quality standards. Avoid skipping inspections for witness points or downtime, because the cost of avoiding errors is always much lower than the cost of remedial errors. The results of quality monitoring should adopt the corresponding statistical methods is analyzed, such as pareto diagram method (ordered by frequency histogram, it shows the types of ide

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档