- 1、本文档共70页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
7 国际工程合同条件的理解与运用3
第三节 国际工程合同中的保修 63(1) Determination of the Contractor’s employment If (a) the Contractor shall be in default in that he (i) becomes bankrupt or has a receiving order or administration order made against him or presents his petition in bankruptcy or makes an arrangement with or assignment in favour of his creditors or agrees to carry out the Contract under a committee of inspection of his creditors or (being a corporation) goes into liquidation (other than a voluntary liquidation for the purposes of amalgamation or reconstruction) or (ii) assigns the Contract without the consent in writing of the Employer first obtained or (iii) has an execution levied on his goods which is not stayed or discharged within 28 days or (b) the Engineer certifies in writing to the Employer with a copy to the Contractor that in his opinion the Contractor (i) has abandoned the Contract or 第三节 国际工程合同中的保修 (ii) without reasonable excuse has failed to commence the Works in accordance with Clause 41 or has suspended the progress of the Works for 14 days after receiving from the Engineer written notice to proceed or (iii) has failed to remove goods or materials from the Site or to pull down and replace work for 14 days after receiving from the Engineer written notice that the said goods materials or work have been condemned and rejected by the Engineer or (iv) despite previous warnings by the Engineer in writing is failing to proceed with the Works with due diligence or is otherwise persistently or fundamentally in breach of his obligations under Contract then the Employer may after giving 7 days’ notice in writing to the Contractor specifying the default enter upon the Site and the Works and expel the Contractor therefrom without thereby avoiding the Contract or releasing the Contractor from any of his obligations or liabilities under the Contract. Provided that the Employer may extend the period of notice to give the Contractor opportunity to remedy the default. Where a notice of determinat
您可能关注的文档
- 6-有限元方法.ppt
- 6-社会公益性.doc
- 600MP级热轧双相钢生产工艺与组织性能的研究开题报告.doc
- 601-行情回顾 上证走势.ppt
- 602负负反馈的四种组态.ppt
- 6-脂溶性维生素ppt.ppt
- 60立方米水力循环澄清池S771二.doc
- 60周年校庆接受招商赞助项目.doc
- 61 数列概念和简单表示法.ppt
- 616ICU相关制度.doc
- 中国国家标准 GB/T 45390-2025动力锂电池生产设备通信接口要求.pdf
- 中国国家标准 GB/T 45393.2-2025信息技术 建筑信息模型(BIM)软件 第2部分:参数化模型.pdf
- GB/T 45393.2-2025信息技术 建筑信息模型(BIM)软件 第2部分:参数化模型.pdf
- 《GB/T 45393.2-2025信息技术 建筑信息模型(BIM)软件 第2部分:参数化模型》.pdf
- GB/T 10184-2025电站锅炉性能试验规程.pdf
- 海尔智家股份有限公司海外监管公告 - 海尔智家股份有限公司2024年度环境、社会及管治报告.pdf
- 上海复旦张江生物医药股份有限公司2024 环境、社会及管治报告.pdf
- 中国邮政储蓄银行股份有限公司中国邮政储蓄银行2024年可持续发展报告.pdf
- 豫园股份:2024年环境、社会及管治(ESG)报告.pdf
- 南京熊猫电子股份有限公司海外监管公告 - 2024年度环境、社会及治理(ESG)报告.pdf
最近下载
- 骨科无菌术 手术区域的准备.pptx
- 《海岸带生态系统现状调查与评估技术导则 第7部分:牡蛎礁》(报批稿).pdf VIP
- GB4943-2001 信息技术设备 安全 第1部分:通用要求.pdf
- 基于舞弊风险因子理论的柏堡龙财务舞弊案例研究.pdf
- 《海岸带生态系统现状调查与评估技术导则 第5部分:珊瑚礁》(报批稿).pdf VIP
- 建筑施工安全风险辨识和分级管控指南、台账、企业安全风险分级管控清单.docx VIP
- 2025年施工员考试题库及完整答案【名师系列】.docx VIP
- 2025年施工员考试题库附完整答案【夺冠】.docx VIP
- 2025年白蚁防治员岗位职业技能资格知识考试题库(附含答案).docx
- 国际护士节护理操作技能竞赛理论题库.docx
文档评论(0)