- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
《Presentation Title》
Brio Rapid Transit System Update on Stations and Timetables July 10, 2012 Progress Update Timetable Station Sizes Station Features / Amenities Station Art Brio Overview PROGRESS UPDATE – JULY 2012MESA ALAMEDA RTS CORRIDORS Investigation / Data Collection Metes Bounds Surveys for Mesa Underway All Other Items Complete Station Locations Finalized for Mesa Corridor Camille relocated to far side due to property encroachments Adjustments Remain for Alameda Corridor Additional right-of-way needs being assessed for stations and amenities improvements Station Design Branding Station Design Approved by Mass Transportation Board (MTB) System Name “Brio” Color and Logo Next Branding Items Artists Developing Station - Specific Designs PROGRESS UPDATE – JULY 2012MESA ALAMEDA RTS CORRIDORS Schedule Mesa Corridor Preliminary (30%) Plans Submitted September 28, 2011 Pre-Final (60%) Plans Submitted March 1, 2012 Final (100%) Plans – August 8, 2012 Alameda Corridor Preliminary (30%) Plans Submitted December 15, 2011 Pre-Final (60%) Plans – July 26, 2012 Final (100%) Plans – October 2, 2012 PROGRESS UPDATE – JULY 2012MESA ALAMEDA RTS CORRIDORS Key Next Steps Continued Coordination with TxDOT and FTA Continued Coordination with Planning Regarding Illumination Continued Coordination with Private and Public Utilities Branding – Color Logo Public Art – Finalize Installations / Concepts Alameda (In Design) 15.25 miles 17 proposed stations Design: May 2011 – Oct 2012 Procurement: Jan – March 2012 Procurement: Dec. 2012 – April 2013 Construction April 2012 – Sept. 2013 Construction: April 2013 – April 2014 Mesa (In Design) 8.4 miles 13 proposed stations Design: June 2011 – Aug 2012 Procurement: July – Sept. 2012 Procurement: Nov. 2012 – Feb 2013 Construction Oct. 2012 – Sept. 2013 Construction: Feb 2013 – Jan 2014 Brio Corridors Dyer ($15.4M FTA Funding Approved - $5M Short; Will reapply for shortfall Sept 2012) 11.7 miles 12 proposed stations Design: Jan - Dec 2013 Proc
您可能关注的文档
- “4610”精细化推进交流材料.ppt
- “From New Orleans to Iraq Stop the War on the Poor.doc
- “Electron Crystal” in Underdoped Cuprates T Hanaguri, C ….ppt
- “Grants - an insight”.ppt
- “Georgia Landforms on My Mind”.ppt
- “I Couldn’t Control Myself”” Murder in Post WWI Berlin.ppt
- “Lettre ma soeur militaire qui part en Afghanistan”.doc
- “Missions in the 21st Century”.ppt
- “Healthy Moms, Health Babies” Creating a Culturally-Sensitive.ppt
- “Opening the Mouth” Continuing MCH Education in Oral Health.ppt
原创力文档


文档评论(0)