综合评价法(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
综合评价法(国外英文资料)

综合评估法(国外英文资料) Comprehensive evaluation method Bid assessment method (post-qualification review) This project subject to tender using comprehensive evaluation method (price) to the bid assessment, the bid assessment committee established according to law by the tenderer, first after qualification examination, and then according to the tender offer, the engineering quality, time limit for a project, the construction plan, samples of five aspects, such as comprehensive evaluation score of the bid documents, to the scoring system. In the meantime, the relevant provisions of the general bid evaluation rules for salt city salt areas are also applicable. (1) qualification examination To examine whether the qualifications of the bidders are in conformity with the tender announcement and bid documents. 2, review the original business license (copy) provided by the bidder, the original construction qualification certificate (copy), the enterprise safety production license (copy), level 3 project manager certificate, the original registration certificate (or build division) original and original production safety inspection certificate, issued by the local labor department authorized client and project manager (project manager) in this unit to pay Labour insurance certificate of the original shall prevail. The failure to submit the above original information or the incomplete information, or the poor record of the bidder, shall not be examined within the period of the public notice. The tendering units that do not pass the qualification examination shall not participate in the detailed review below. (2) detailed review Bid quotation (70 points) Effective bid quotation: (1) the bidders offer is in conformity with the requirements of the tender documents and the request for the tender, and the evaluation shall not be lower than the cost. (2) the bidders offer is not above the highest limit. (3) the minimum bid price is not less than 90 percent of the arithmetic mean of the bidd

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档