起重机械拆装安全操作规程(国外英文资料).docVIP

  • 9
  • 0
  • 约1.56万字
  • 约 14页
  • 2017-06-08 发布于河南
  • 举报

起重机械拆装安全操作规程(国外英文资料).doc

起重机械拆装安全操作规程(国外英文资料)

起重机械拆装安全操作规程(国外英文资料) Lanzhou Jin Yuan construction machinery rental service station Safety operation rules for disassembly and assembly of hoisting machinery I. Basic requirements 1. the operator must have a thorough knowledge of the work site environment, roads, overhead lines, buildings, and the construction, weight and distribution of the work prior to operation. 2. lifting command personnel must be documented, and should work closely with the operating personnel, the implementation of the provisions of the command signal. The operator shall operate according to the signal of the commander. The operator may refuse to execute the signal when the signal is not clear or incorrect. 3. in the open air there are six or more strong winds or heavy rain, heavy snow, heavy fog and other inclement weather, should stop lifting operations. 4. crane, below hoist boom and heavy it was forbidden to stay, or by. When heavy loads are hoisted, it is strictly forbidden to pass through the people. It is strictly forbidden to transport personnel by crane. 5. it is strictly prohibited to use cranes to carry out oblique pulling, oblique lifting and lifting, heavy weights embedded in the ground or objects of unknown weight. Site casting of concrete components or formwork must be all loose before lifting. 6. lifting heavy objects should be tied smoothly and firmly, not to pile or hang scattered objects on heavy objects. The angle between the sling and the object shall be 45 degrees to 60 degrees, and shall not be less than 30 degrees. Pads shall be added between the sling and the object shuttle angle. 7. the crane shall not operate near overhead transmission lines, and the safety distance shall be in accordance with the provisions of the following table Voltage (KV) safe distance 1 1 - 1.5 20 - 40 60 - 110 Two hundred and twenty Vertical direction (m) One point five Three Four Five Six Horizontal direction (m) One One point five Two Four Six 8. wire rope is fixedly connected with knittin

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档