- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
吉林市商贸旅游及其他项目目录doc
吉林市商贸旅游及其他项目目录
吉林市江南购物中心商业地产项目………………………… 2
吉林市旅游风情小镇整体改造项目………………………… 3
东北亚先导区农副产品物流中心…………………………… 5
蛟河市松花湖休闲度假旅游项目…………………………… 8
莲花山国家级森林公园综合开发项目………………………11
红石湖旅游综合开发项目……………………………………15
兰天小区商贸开发项目………………………………………18
上海路小区商贸综合开发项目………………………………19
吉林市CBD商务服务中心项目………………………………21
吉林市参会项目
manufacturers of technical documents on the quality requirements applicable to this project. Construction quality inspection and evaluation standards issued by the national power company of the electric power construction standard for quality inspection and assessment of the 11 articles assessment inspection standards as well as other relevant regulations issued by the Ministry of electric power, the State power company executive. Does not verify in the specification within the evaluation criteria, implementation design, manufacturer or ... Or issue a new national standards and regulations, bidders shall comply with new norms and standards. If there are conflicts or is inconsistent, whichever is the higher standards. 3.3 3.3.1 project of responsibility, authority and communication organization and project managers, at all levels of responsibility and authority see section II of chapter III of the present tender site management organization and part of workforce planning. 3.3.2 according ISO 9001, GB/T 50430 and company quality distribution of the quality manual, combining the departments of projects, project quality function distribution allocation table on the following page of the projects quality functions shown below. 3.3.3 project with each Department interface, interface between the internal departments of the project by project managers at all levels and the quality regulations of the responsibilities and authorities of the Department. Customer requirements and hope: project management; Quality planning, management program: the projects quality control Department; Site design: Project Engineering Department; Contract: the contract budget
manufacturers of technical documents on the quality
您可能关注的文档
最近下载
- 家政讲师师资培训课件.ppt
- 细菌群体感应信号分子及其检测方法.docx VIP
- 【基于企业作业成本法的企业成本控制研究的国内外文献综述4000字】.docx VIP
- 2025年中级注册安全工程师之安全生产技术基础题库(考试直接用).docx VIP
- 10.2捍卫国家利益课件.pptx VIP
- 2025年中级注册安全工程师之安全生产技术基础题库及参考答案【考试直接用】.docx VIP
- 人教版物理九年级上册《第十六章 电压 电阻》大单元整体教学设计.docx
- 中文书名《我的姐姐罗莎琳·富兰克林》.doc VIP
- 2025年中级注册安全工程师之安全生产技术基础考试题库附参考答案【考试直接用】.docx VIP
- 【MOOC期末】《中国马克思主义与当代》(北京科技大学)期末慕课答案.docx VIP
文档评论(0)