工程测量 摘要1(国外英语资料).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程测量 摘要1(国外英语资料)

工程测量 摘要1Engineering is usually divided into three stages: planning (design), construction (construction or production) and operation (management or use).Engineering measurement is the application of surveying and mapping theory and methods for various projects in planning (design), construction (production), operation (management or use).The technology to provide product location, shape and size assurance and service.The measuring accuracy of the project is divided into general engineering measures and precision engineering measures.Engineering surveying task: the main task of the planning stage is the survey of the project, surveying and mapping all kinds of scale topographic maps, and carrying out the establishment of the control net.In the area of poor geological conditions, the stability monitoring of the formation is also carried out.The main tasks of the construction phase are construction survey and supervision measurement. The construction measure is to calibrate the location of the project design target.As the basis of the construction, the construction control network is established and the construction work is done.Safety monitoring is the main task of the project operation phase.Engineering measurement work content: control network establishment (stages of mapping, construction, installation and control network and distortion control network);Topographic mapping Construction release (construction phase); Quality inspection (construction phase); Deformation monitoring (engineering construction, operation phase).The establishment of the engineering control network: the project control network has the function of controlling the whole, providing the reference and controlling the accumulation of error.The project control network is divided into the control net, the construction control network, the installation control network and the deformation control net. The latter is collectively referred to as the special control network.The chart control network is i

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档