工程项目社会评价方法试卷(国外英语资料).doc

工程项目社会评价方法试卷(国外英语资料).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程项目社会评价方法试卷(国外英语资料)

工程项目社会评价方法试卷 The topic of this question is 15 questions. ? (???) It is more important to allow stakeholders in the project to play a role in specific activities such as project decision making and implementation. (a) ? A: traditional action? ? Traditional? ? C. participatory action? ? D. Participation? After the project in social evaluation, the evaluation should be analyzed. The actual situation of the project and its changing condition are predicted based on this. (a) ? A. During the implementation of the project? ? After the project is completed? ? C. Project pilot phase? ? How long does the project take place? 3.2.13 organization for economic cooperation and development in a country or region social median income or average income (?????) as the country or regions poverty line. (a) ? A. 20%? ? B. 30%? ? C. 50%? ? D. 60%? 4. Participatory social evaluation emphasizes invite different aspects of the stakeholders involved in the specific process of social evaluation, and special requirements for the local staff (??? Social evaluation task force. (a) ? Directly involved? ? Indirect participation? ? C. Keep away? ? D.? In engineering projects involving ethnic minorities, it is best to initiate social evaluation at the stage of (?????). (a) ? A. project preparation? ? B. project design? ? C. Project implementation? ? D. Project operations? 6. (??) in the evaluation of social, should also be quoted directly or indirectly data as far as possible, so that the nature of the social impact of proposed project and the influence degree of qualitative judgement conclusion is given. (a) ? A. scenario analysis? ? B. qualitative analysis? ? Quantitative analysis? ? D. causal analysis? Public participation will inevitably involve investment in time, money and technology, and risk all kinds of risks. The following is not the risk of public participation (???) It is. (a) ? A. may raise the expectations of the project in A way that is difficult to meet? ? B. Is it easy to attract pub

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档