2014东财《工程项目管理》在线作业二(国外英语资料)
2014东财《工程项目管理》在线作业二(国外英语资料)
Easternmoney project management of online homework two
Total score: 100 test time: - test scores: 100
First, radio questions (5 questions, 20 points) Score: 20
1., in foreign countries, the most typical country for the development and evolution of construction management is ()
A. America
B. UK
C. Japan
D. Germany
Answer: B
Full Score: 4 points: 4
2.____ organize the supervision plan of this major or sub project, and organize the implementation after the approval of the general supervisor
A. chief supervisor
The B. item supervision division
C. Supervisor
D. other personnel
Answer: B
Full Score: 4 points: 4
3. engineering project investment control is in the project decision-making stage, design stage, construction stage and contracting stage, takes place within the approved investment ____, correct deviation at any time, in order to ensure the realization of project investment management.
A. investment limit
Total investment in B.
C. investment plan
D. investment scale
Answer: A
Full Score: 4 points: 4
4.____ is the direct operator supervision matters, the general should be in accordance with the requirement of professional work allocation, should also be configured when necessary placement
A. chief supervisor
The B. item supervision division
C. Supervisor
D. other personnel
Answer: C
Full Score: 4 points: 4
5. the project period, refers to the beginning of a project from planning ____, until the project is completed and put into production, the process of recovery of investment
A. project approval
B. feasibility study
C. investment
D. project evaluation
Answer: A
Full Score: 4 points: 4
Two, (a total of 20 multiple-choice questions, a total of 80 points.) Score: 80
1. there are three kinds of risk ____
A. risk elimination
B. risk control
C. risk retention
D. risk transfer
Answer: BCD
Full Score: 4 points: 4
2. project planning system is mainly ____
A. implementation plan
B. accreditation program
C. acceptance
D. operating readiness plan
A
您可能关注的文档
- 14春学期《中级会计学》在线作业(国外英语资料).doc
- 14个经典面试问题回答技巧(国外英语资料).doc
- 14福师《小学生心理健康教育》在线作业二(国外英语资料).doc
- 14秋学期《经济法》在线作业(国外英语资料).doc
- 14秋福师《市政学》在线作业二(国外英语资料).doc
- 14秋西交《程序设计基础(高起专)》在线作业答案(国外英语资料).doc
- 15《枣儿》 教案教学设计(人教版九年级上册)(国外英语资料).doc
- 15个小习惯(国外英语资料).doc
- 15分钟内鸡蛋早餐四种搭配方案(国外英语资料).doc
- 13春福师《马克思主义基本原理概论》在线作业二答案(国外英语资料).doc
- 2023-2024学年广东省深圳市龙岗区高二(上)期末物理试卷(含答案).pdf
- 2023-2024学年贵州省贵阳市普通中学高一(下)期末物理试卷(含答案).pdf
- 21.《大自然的声音》课件(共45张PPT).pptx
- 2023年江西省吉安市吉安县小升初数学试卷(含答案).pdf
- 2024-2025学年广东省清远市九校联考高一(上)期中物理试卷(含答案).pdf
- 广东省珠海市六校联考2024-2025学年高二上学期11月期中考试语文试题.pdf
- 2024-2025学年语文六年级上册第4单元-单元素养测试(含答案).pdf
- 2024-2025学年重庆八中高三(上)月考物理试卷(10月份)(含答案).pdf
- 安徽省安庆市潜山市北片学校联考2024-2025学年七年级上学期期中生物学试题(含答案).pdf
- 贵州省部分校2024-2025学年九年级上学期期中联考数学试题(含答案).pdf
文档评论(0)