2014东财《工程项目管理》在线作业二(国外英语资料).doc

2014东财《工程项目管理》在线作业二(国外英语资料).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2014东财《工程项目管理》在线作业二(国外英语资料)

2014东财《工程项目管理》在线作业二(国外英语资料) Easternmoney project management of online homework two Total score: 100 test time: - test scores: 100 First, radio questions (5 questions, 20 points) Score: 20 1., in foreign countries, the most typical country for the development and evolution of construction management is () A. America B. UK C. Japan D. Germany Answer: B Full Score: 4 points: 4 2.____ organize the supervision plan of this major or sub project, and organize the implementation after the approval of the general supervisor A. chief supervisor The B. item supervision division C. Supervisor D. other personnel Answer: B Full Score: 4 points: 4 3. engineering project investment control is in the project decision-making stage, design stage, construction stage and contracting stage, takes place within the approved investment ____, correct deviation at any time, in order to ensure the realization of project investment management. A. investment limit Total investment in B. C. investment plan D. investment scale Answer: A Full Score: 4 points: 4 4.____ is the direct operator supervision matters, the general should be in accordance with the requirement of professional work allocation, should also be configured when necessary placement A. chief supervisor The B. item supervision division C. Supervisor D. other personnel Answer: C Full Score: 4 points: 4 5. the project period, refers to the beginning of a project from planning ____, until the project is completed and put into production, the process of recovery of investment A. project approval B. feasibility study C. investment D. project evaluation Answer: A Full Score: 4 points: 4 Two, (a total of 20 multiple-choice questions, a total of 80 points.) Score: 80 1. there are three kinds of risk ____ A. risk elimination B. risk control C. risk retention D. risk transfer Answer: BCD Full Score: 4 points: 4 2. project planning system is mainly ____ A. implementation plan B. accreditation program C. acceptance D. operating readiness plan A

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档