大型油-气套管变压器现场局放试验及故障诊断(国外英语资料).docVIP

大型油-气套管变压器现场局放试验及故障诊断(国外英语资料).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大型油-气套管变压器现场局放试验及故障诊断(国外英语资料)

大型油-气套管变压器现场局放试验及故障诊断(国外英语资料) Field PD test and fault diagnosis of large oil gas casing transformer Source: China Motor maintenance network add time: 2005-11-4, 12:50:38 browsing: Preface Changchun power supply company has built a 220kV central substation in the city network reconstruction project. In order to reduce the gross area, the high voltage 220kV and the low voltage 66kV side of the substation adopt cable outlet. Switch factory selected GIS combination appliances. There are 2 sets of 180MVA oil insulated bushing main transformer in substation. Taking into account the importance of load and geographical location, the main transformer chose a transformer produced by a famous joint venture factory in china. After the transformer is installed, routine high voltage test and chromatographic analysis are carried out according to the regulations. All the tests are qualified. After more than 72h static discharge, partial discharge tests were carried out on 2 transformers. The experimental results show that the #2 main transformer put test once passed, A, B, C three NQN were about 50pC; the test voltage A voltage to the rated #1 main transformer in 1 / 3 (relative to A voltage is about 73kV), the partial discharge quantity is more than 1 million pC regulations far more than the rules of less than 500pC; chromatographic partial discharge test after analysis found that oil acetylene value increased from 0 to 16 before the test * 10 - 6 L. The results of the two tests have proved that the main transformer of #1 is in a serious discharge fault, and it must be checked before it can be put into the running of the system. Field discharge test of 1 large oil gas casing transformer Generally speaking, it is much more difficult for oil field bushing transformer on-site test to be larger than ordinary bushing transformer. This is because when the oil gas casing transformer is tested, the non test case is connected to the ground, and the test case needs to be fitted with a temp

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档