- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
开沟器(国外英语资料)
开沟器(国外英语资料)
Furrow opener
Furrow opener
A furrow that guides seeds (fertilizers) and leaves them covered with wet soil. The quality of the opener t directly affects the quality of the seeding. Therefore, for out of the trench depth, depth, width, groove shape, has its own class soil effect, and dry and wet soil is mixed, fine wet soil to cover the seeds for seed germination. The opener in their soil angle can be divided into two types of acute and obtuse angles. An opener is hoe, shovel, shovel shaped wing ship type, core type zinc, obtuse angle opener are mainly single disc, double disc, sliding knife, shoe etc.. The commonly used furrow opener is shown in fig.. Zelda shovel type opener of standard type, general type, joint type and plant type etc.. At work, by self and additional gravity, under traction, there is a tendency of self - man and earth, so the soil is good. Hoe tip and ridge will be part of the rising slope, the bottom soil up to the surface; hoe on both sides of the squeezing effect on slope, ditching and grooves formed after mound. But part of the lower than the wet soil was turned into the upper, and the dry and wet soil mix, easy entropy, not to dry areas. If the soil preparation requirements are not strict before sowing, it is easy to cause the soil to be entangled or blocked. Has the advantages of simple structure, portability, easy manufacture, low speed for grain drills. The corpse baby a). A few shovel type (b) core type zinc (E) single disc d) double disc (E) opener for ridge map of Zheng type furrower Chinese core special slide structure commonly used by ditching the knife, is the comprehensive inherent design features and core. When working, its front edge and symmetry surface along the curved upward Tucheng side, and the stubble, surface clods, weeds to two thousand thrown. The soil preparation requirements before sowing are not high, and the furrow can be dug on the stubble stubble land, which is beneficial to clear the stubble and weeds
您可能关注的文档
- 对富爸爸系列的批评性浏览(国外英语资料).doc
- 对应肌肉位置(国外英语资料).doc
- 对建筑施工裂缝的成因及预防措施的探讨(国外英语资料).doc
- 对我国金融风险及其防范问题的几点认识(国外英语资料).doc
- 对接受式学习与发现式学习的比较分析(国外英语资料).doc
- 富翁具备的15种特质(国外英语资料).doc
- 对标定位找差距 凝心聚力争一流——赴江西南昌、宜春等…(国外英语资料).doc
- 对男士护肤品的个人体验和总结(国外英语资料).doc
- 对气开阀门、气闭阀门的解释(国外英语资料).doc
- 对称算法于非对称算法(国外英语资料).doc
- 2022-2023年公共营养师之三级营养师考前冲刺试卷附带答案.docx
- 2022-2023年公共营养师之三级营养师考前冲刺练习题库附有答案详解.docx
- 2022-2023年公共营养师之三级营养师测试卷附答案详解.docx
- 2023年公共营养师之三级营养师综合提升练习试题包括详细解答.docx
- 2023年公共营养师之三级营养师通关模拟题库附答案.docx
- 2022-2023年公共营养师之三级营养师考前冲刺练习题附答案.docx
- 中级注册安全工程师之安全生产法及相关法律知识通关练习试题附答案.docx
- 2022-2023年公共营养师之三级营养师考前冲刺模拟题库包含答案.docx
- 中级注册安全工程师之安全生产法及相关法律知识练习题库附答案.docx
- 2022-2023年公共营养师之三级营养师考前冲刺测试卷包括详细解答.docx
最近下载
- EPC项目-市政道路延长线勘察设计施工(EPC)总承包项目-技术标(承包人实施方案、技术方案、管理组织方案).docx
- “双师型”师资队伍建设策略研究课题中期研究报告.doc
- 护士延续注册申请表_5.doc
- 贵金属行业研究:深度复盘:实际降息前黄金股相对收益最高.pdf VIP
- 职工职业技能竞赛—建筑信息模型(BIM)试题题.pdf VIP
- 宁波镇海蛟川书院小升初入学考试卷(含参考答案).doc
- 信访事项说服调解笔录.doc VIP
- (苏教版)小学数学五年级下册暑假作业设计.doc
- 第五课 在和睦家庭中成长(课件)2024年高考政治一轮复习(选择性必修2).pptx
- 江苏省常州市2023-2024学年高一上学期期末学业水平监测数学试卷(解析版).docx VIP
文档评论(0)