- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
措施项目工程量的计算(国外英语资料)
措施项目工程量的计算(国外英语资料)
The calculation measures project amount of 2011.5.30 (1) reading a list of 2008 115... | diary (3) praise praise praise (3) (3) cancel praise (3) (1948 Reprint) share comments copy edit address
In addition to the cost of construction elements of building itself into the entity, there is the construction enterprise management level, the construction site and ensure the smooth implementation of the completion of the project and to the technical and the safety and life of the project before construction and construction process in non project entity, referred to as the project measures.
The list of Measures refers to the project that does not constitute an engineering entity before and during the construction process. It is divided into general projects and professional projects.
The term project cost refers to the sum total of the necessary measures for the completion of the project list of measures necessary for the construction.
Measure item list valuation, common formula, parameter method valuation and quota method valuation. The formula is calculated according to the parameters of valuation of certain base multiplied by the rate (~ = project cost * rate); the same quota valuation and the partial method to calculate the comprehensive unit price method (= to measure item quantity * comprehensive unit price), mainly refers to some close contact with the body of the project, such as a template, scaffolding, vertical transportation and high efficiency reduction, machinery import field, construction of drainage and deep foundation pit protection.
Scaffolding works
(1) establishment and explanation of fixed items;
1, this chapter includes eight parts and 60 items, and the quota items are listed in table
2, familiar with the quota that 2 P39 1, 2, 3
3, pay attention to the general construction scaffolding and decorative scaffolding relations II P39 11, 12
4, scaffolding occurred in the process of construction, refers to the building or structure in the
您可能关注的文档
最近下载
- 捕歼战斗中地排教案设计.doc VIP
- 深圳希莱恒电解质说明书.doc VIP
- 开展体育领域突出问题专项整治工作情况汇报.docx VIP
- 学校安全生产风险分级管控和隐患排查治理双重预防体系建设实施指南.pdf VIP
- 双眼视异常分析临床处理2020.pptx VIP
- 排捕歼战斗连贯演练.docx VIP
- Illustrator教程Illustrator绘图技巧Illustrator经典实例Illustrator网格工具绘制逼真花瓣.pdf VIP
- 民企混改公司合作协议书10篇.docx VIP
- 如何免费申请QQ号申请qq号方法.docx VIP
- Illustrator进阶技巧.pdf VIP
文档评论(0)