- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
中国石油北京《油气井工程设备与工具》第三阶段在线作业(国外英文资料)
中国石油北京《油气井工程设备与工具》第三阶段在线作业(国外英文资料)
China petroleum university of China petroleum university, Beijing - the third stage online homework
Individual choice
The main parameters of the rig are:
A. drilling depth
B. The maximum hook for the drill
C, c. rig drilling depth
D, D
Number 2 rig model ZJ70LDB rig, its maximum drilling depth is:
A, a. 1000 meters
B, B. 7000 meters
C, C. 3000 meters
D, thed5000 m
The three main working units of the third rig include:
A, a. winch, rotary, drilling pump
B, b. winch, skycar, derrick
C, C., rotary, derrick
D, d. drilling pump, derrick, car
Question 4. Which of the following equipment is not the equipment that makes the rig up?
A, a. winch
Block B, B..
C, c. hook
D, d. faucet
Question 5. What are the three main components of the top driver system?
A, a. power and faucet assembly, guide rail assembly, pipe assembly assembly
B, B. Faucet, turntable, drill column
C, C., and turn the faucet
D, d. faucet, turntable, skycar
The purpose of the automatic drill-down system is to set up the drill
A, A. Keep the drill at constant speed
B. keep the drill pressure constant
C, c. reduce the vibration of the drill column
D, d. reduce friction
Which of the following devices is not a mud solid control device?
A, a. mud pump
B, b. vibrating screen
C, c. spin mud
D, d. desander
The correct sequence of drilling fluid (mud) cycle is:
A, A, the mud pump, the ground pipe, the pipe, the faucet, the faucet, the pipe, the drill pipe, the drill string, and the hole
B, b. mud tank to vibratory screen, mud pump, ground pipe transfer, pipe to pipe, faucet, drill column, bit, ring, hole
C, C., mud pumps, mud pumps, ground pipe, pipe, faucet, drill string, drill pipe, ring, hole, and shaker
D, D. Mud can, mud pump, ground pipe, pipe, water faucet, the ring, the drill pipe, the drill pipe, the drill pipe, and the drill pipe
One of the main reasons for the more secure and reliable reliability of the ac converter electric rig than the dc electric rig is:
A, A. Ac conve
文档评论(0)