- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工作票签发人试题(国外英文资料)
工作票签发人试题(国外英文资料)
The work ticket is issued by the issuing man
One, fill in the blanks
The work ticket is usually filled in by (the issuing person of the work ticket) and should be made clear to the head of the job at the time of issuance. Can also be filled out by working controller, fill in the following working ticket issuance of audit, working ticket issued by a person to working ticket issued after the entire contents of the confirmation and correct, and still should content all working ticket to working controller for a detailed explaination.
The staff of the work ticket shall be held by the persons who are published by the company. The work manager shall be approved by the company and shall be subject to examination and approval (written) once a year.
The job holder shall not be responsible for the work. The work permit shall not issue the work ticket.
4, safety measures of execution by the maintenance staff, working ticket should be issued after the measures indicate the self-care (repair), shows the measures by maintenance staff to deal with.
5, working ticket, be sure to fill out the detailed and do work content (clear), electric equipment to be used (double) number, location (clear).
6, fire work must be carried out in the area of fire protection and fire work in (forbidden) area.
7, for some important equipment, especially complex protector on the work, in addition to implement the system of working ticket, must also be at the same time, the control system of execution security ticket system or (relay protection safety measures) system.
8, in electric power production equipment and systems for the operation of the project is divided into (security) and two parts (measures), two content shall be determined by a hazard analysis.
(before 9, the implementation of specific maintenance task analysis, identify) task process there may be a dangerous point, and formulate (risk control measures), fill in the working ticket. The risk point analysis is organized by
您可能关注的文档
最近下载
- 黑龙江农业工程职业学院单招数学模拟试题(附答案).docx VIP
- 2025读书心得:屏幕时代如何重塑孩子的自控力.docx VIP
- 中国艰难梭菌感染诊断、治疗与预防指南(2024)详细解读PPT课件.pptx VIP
- 第14课《我们都是中国人》第2课时 这是我国的标志 教案设计 2025道德与法治二年级上册.docx
- 湘少版四年级上册、下册的英语单词默写表.pdf VIP
- GBT 危险货物运输应急救援指南 第1部分:一般指南.pdf VIP
- 煤炭掺配合同范本.docx VIP
- 汽车整体认识(汽车发展史)-精.ppt VIP
- 生产安全事故现场处置方案.docx VIP
- 小学数学二年级下册应用题练习.docx VIP
文档评论(0)