- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水利施工组织设计施工组织设计(国外英文资料)
水利施工组织设计施工组织设计(国外英文资料)
In this paper, by lpx981013 contribution
Doc documents may have a poor browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view.
Design and design of water conservancy construction organizations
The reservoir is located in the xin zhuang river, a tributary of the xinzhuang town in handan, and the basin area is 85km2, which was built in 1965. Reservoir upstream watershed area of 85 km2, control the reservoir total capacity of 24.3 million m3, irrigation capacity of 14 million m3, die capacity of 900000 m3, is the collection of flood control, urban and rural comprehensive utilization of agricultural water is equal to a suit of a medium-sized reservoirs. The reservoir mainly consists of the main dam, the spillway, the north and south water holes and power stations. The project includes: main dam reinforcement project, new construction project of sub-dam, new flood discharge lock project, and the water and cement project of north and south. A, terrain, landform and geological dam site area is located in the upstream XinZhuangHe, terrain into high middle and low on both sides of a white shape depressions, to form is given priority to with hilly topography and river valley landforms. Main dam, spillway geological situation briefly as follows: (1) the main main points north dam section and the south dam section two, the north dam block cin drallig ZhuangHe main river, the south dam section on the denudation monadnock and residual mountain. North dam section for containing sand loam core wall filling soil, a light brown to tan, local is a small amount of gray, brown, gray, black noise, such as wet ~ saturated, plastic ~ hard plastic state, the upper part of local hard or hard plastic shaped, with a strong local viscosity. The average dry density of the core wall was 1.70 g/cm3. The upstream sand is composed mainly of gravel coarse sand, which is local fine gravel sand, and the average of
您可能关注的文档
最近下载
- 2025年护理员证考试试题及答案.docx
- 高速公路施工图技术交底kqaxxdnq.doc VIP
- 部编版五年级语文上册第四单元综合试卷附答案.doc VIP
- 南京旅游攻略介绍ppt课件(优质ppt).pptx
- 某村土地整治项目监理规划方案(DOC 62页).doc VIP
- 鸿蒙崛起:探索新一代技术 课件全套 第1--10章 鸿蒙操作系统概述 ---项目示例-移动车载APP设计.pptx
- 老旧小区改造环境保护与节能设计方案.docx
- 1_城市轨道交通工程较大事故案例分析+-+副本.pdf VIP
- T_CRACM 0001-2025 中国人面部皮肤美白状态评价方法.docx VIP
- 2025至2030粮油产业行业项目调研及市场前景预测评估报告.docx
文档评论(0)