谈谈钻孔灌注桩的施工体会(国外英文资料).docVIP

谈谈钻孔灌注桩的施工体会(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
谈谈钻孔灌注桩的施工体会(国外英文资料)

谈谈钻孔灌注桩的施工体会(国外英文资料) As a kind of basic bearing structure and foundation supporting structure, bored pile is the technology content that is widely used in construction construction. However, the internal quality of the bored pile is invisible, and it is impossible to observe the internal quality of the pile, and it is not realistic for the cost and the period of construction. Therefore, generally in the construction of it as a key project, and select team of excellent construction technology, to improve the quality of construction process management, grasp and construction problems that may occur in the process of analysis. Eliminate all bad risks before they become piles. The main problems of the construction process of bored piles are discussed, and the experience and experience are discussed. One, the control of the hole quality It is an important process in the construction of concrete grouting pile, and its quality control will directly affect the bearing capacity of pile and pile. Therefore, the construction technology and construction quality control should focus on the following tasks. 1, use the septum construction procedure. The bored pile is made into a hole and then piled in the hole. The hole stage is balanced by mud, and the surrounding soil is loose when the pile is drilled. It is a safe technical measure to prevent the hole and the shrinkage diameter. The vertical degree of the hole. The vertical degree of the bored pile is an important link to guarantee the stability of the base bearing capacity and the stability of the structure and the accuracy of the building dimensions. The main reason for the inclined hole or bent hole is: the position stability of the rig, the vibration of the drill, or the bending of the drill pipe. When the ground is weak or uneven; The soil layers are either oblique or large in the soil or other hard objects. In these cases, the preparation must be carefully prepared before construction, and the ground will be leveled and

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档