- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
路基施工(国外英文资料)
路基施工(国外英文资料)
Construction plan of the roadbed soil stone
First, the general situation of the project
A brief introduction to the subgrade project
The project name for foshan beijiao trunk highway engineering and to DS - 14 blocks, pile number of k24 + 850 - k28 + 180, route length 3.33 km, main engineering quantity including: about 999000 cubic meters, earth work excavation, embankment of earth work about 580400 cubic meters, south of the salt road flyover is bounded, give priority to with excavation, south of north of give priority to in order to fill. Which K26 + 900 - K28 + 180 section for overload preloading period of soft soil foundation, K28 + 100 - K28 + 180 for bagged sand well handling zone, K27 + 134.65 ~ K27 and K27 + 159.65 + 159.65 ~ K27 and K27 + 354.57 + 570.81 ~ K27 + 595.81 three sections of 75 m for the cement stirring pile treatment area.
(2) major technical standards
Road grade: the main road is the primary road and the city express road, the auxiliary road is the city main road.
The main road computes the speed of 100Km /, and the auxiliary road is 50Km/h.
8 roadbed width: this project roadbed 79 meters, highway transect layout is as follows: 12 meters (cars) + 6 meters (main and side roads with segmentation) + 18.5 meters (main) + 6 meters (median) + 18.5 meters (main) + 6 meters (main and side roads with segmentation) + 12 meters (cars). The other side of the lane is a 17.5 meter walk and green belt.
Roadway slope: 2 percent of the road of line and hard shoulder, and 2 percent of the lateral pavement.
(3) climate and climate
The district bordering the south China sea, seasonal alternation is not obvious, and the temperature is higher, sunny, subtropical maritime monsoon climate zone, annual average temperature 22.8 ℃, January average temperature 15 ℃, July average temperature 28.4 ℃, extreme minimum temperature 0 oc. The average annual rainfall is 1678mm, and the rainy season is concentrated in the april-september period, which is in the pre-