钢筋笼吊装计划资料(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钢筋笼吊装计划资料(国外英文资料)

钢筋笼吊装方案资料(国外英文资料) Reinforcing cage hoisting plan information. TXT you cant let everyone satisfied, because not all people are successful people is on the way cattle B, an erection you think I will watch you all the way to go to die? I will close my eyes and this article will be made by huxinxnpp Doc documents may have a poor browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view. China railway tunnel co., LTD. Is a section of the h-c32 contract in hanzhong, the western section of the Chinese highway Construction plan for the construction of the pile foundation steel cage of the GUI tree ridge bridge Preparation: review: review: approval: December 2009 December 2009, December 2009, December 2009 daily One, the engineering general situation of the contract period of bridge, a total of 610.065 m, part of the osmanthus tree ridge bridge (ZK434 ~ ZK434 + 619.589 + 294.5), YK434 ~ YK434 + 578.976 + 294.5), the upper structure of 20 m prestressed concrete group Box girder; The lower structure is the pillar pier, the pile foundation, the gravity platform and the expansion foundation. See the bridge engineering quantity table (see page 2) the arrangement of bridge construction organization and time limit for a project a total of 56 root pile foundation, plans to start pile foundation construction in November 2009 and completed at the end of January 2010 pile base construction; To complete the construction of the bridge in March 2010. Second, the steel cage lifting plan 1, reinforcing cage (1) transport, lifting the steel plants with 20 t or 25 t crane will examine qualified reinforcing cage hoisting on camion, when lifting Six lifting point is set on the reinforcing cage, wire rope, retaining ring as hoisting connection parts. The steel cage is horizontal when the crane is hoisted, and it is placed smoothly on the cannon. In order to ensure that the skeleton is not deformed when lifting, the cross should be

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档