10KV高压电缆头冷缩(国外英文资料)
10KV high voltage cable head cooling process
The environmental requirements of production
The production of the head of a 10kV cable cooling terminal must be in a clear, dry air
The construction site should be cleaned without flying dust or scraps of paper.
The requirement of cable in production
The 10kV cable should be clean and unbreakable, with insulation resistance and dc resistance
The test is carried out after the test is qualified. The sealing of the cable head shall be sealed
Closure.
Three step
(1) stripping, steel and lining. Straighten the cable, clean and strip away from the installation
Put the outer sheath of the terminal, the steel armor and the 30mm, the inner sheath 10mm, and use the wire or the P
The VC band is wound round steel to prevent loose. Copper shield ends with PVC tape in case of loose copper
To shield the folds of the fold from the PVC tape, to prevent the damage of the cooling tube.
(2) fixed steel armor line. Push the tripod cones into the cable bifurcation and light steel armor
The paint and rust of the steel wire are fixed to the steel armor by the large constant-force spring. In order to firmly,
The ground line should leave 10 ~ 20mm head, the constant force spring takes it around a circle, turn the head of dew back
Im going to do it with the constant force spring. So does the fixed copper shield.
(3) wrapping the glue. From the following 50mm to the full force spring, steel armor and inner armor,
Wrap the two layers of glue with the filling glue, and a layer at the side of the fork
Full.
(4) fixed copper shielding ground. Divide one end into three strands and use three small constant forces
The spring is fastened to the three-phase copper shield, and then the spring is pushed as far as possible. Wire the steel wire
Keep the copper shield separate, not short.
(5) sticky tape. A layer of black self-adhesive tape for the filling and small constant force spring
It is easy to pull out the plastic bar in the c
您可能关注的文档
最近下载
- 汽车坡道玻璃雨棚施工方案.doc
- 抗精神病药长效针剂治疗精神分裂症的专家共识.pptx
- NB╱T 31112-2017 风电场工程招标设计技术规定.pdf
- 专升本退役士兵计算机考试试卷.docx VIP
- 2018人教版六年级美术上册教案.doc VIP
- 2022年捷昌驱动行测笔试题库.pdf
- 16-pf(卡特尔16种人格因素问卷及答案).pdf VIP
- 龙思思-新媒体产品设计与项目管理-第6章 新媒体产品竞争分析.pptx VIP
- 中华民族共同体概论课件专家版15第十五讲:新时代与中华民族共同体建设.pdf VIP
- 超长大体积混凝土结构跳仓法技术规程超长大体积混凝土结构跳仓法技术规程.pdf VIP
文档评论(0)