- 1、本文档共35页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
100-编号:(国外英文资料)
100-编号:(国外英文资料)
No. :
Building fire service inspection
Project overview table
Project name:
Commission: (seal)
Fill in the date:
Guangdong construction fire service inspection center co., LTD
Company address: second floor of the tianhe sports center, sports center, guangzhou, guangzhou
Contact phone:(line), turn 21 or 22
The phone number:and the 66th fax number:daming
The entrusted unit shall provide the following information:
Construction drawings or drawings for the construction of fire service facilities;
The records of the acceptance of the hidden project, the recording of the system test pressure, the recording of the systems test and measurement (including the circuit insulation resistance, grounding resistance, etc.);
Code chart or coding diagram for fire alarm system;
The inspection of fire control facilities prior to the completion of the inspection shall provide a copy of the letter of approval of the examination of fire control design of the construction project; The fire protection project on the net, needs to provide the construction project fire protection design record accept proof.
The inspection of annual fire control facilities shall provide a copy of the letter of approval of the construction fire control inspection.
Certificate of fire protection products.
If necessary, we can send people to assist the customer in filling out the statistical forms of fire protection facilities.
In order to provide fire monitoring service to our customers, please truthfully fill in the following form:
A summary of fire control engineering
The name of the project
The project address
Fire audit approval document
(fire acceptance approval)
For the record,
The construction unit
The contact
electrophone
Construction unit
The contact
electrophone
Design units
The contact
electrophone
Maintenance unit
The contact
electrophone
Completion date
Drawings information
With a total area of
High floor
Building floor
The tower
The
文档评论(0)