市政造价员考试模拟试题_(国外英文资料)

市政造价员考试模拟试题_(国外英文资料) 1, the mechanical perforation blasting grooves in the groove of the groove are excavated on each side of the slope to allow the excess excavation quantity to be (C). A: ten centimetres b. fifteen centimetres c. twenty centimetres A pit volume of 100 cubic meters is required to be reclaimed from the earth, and the natural compacted soil (D) cubic meter is taken from the ground point. A. 150 b. 130 c. 125 d. 115 The average water level of the construction period is 64.00, the highest surface elevation is 64.50, and the height of the cofferdam is high (B). A. 64.50 b. 65.00 c