盾构施工技术-14
Zhongwu Gas Pipeline Yichang Honghuatao Changjiang Tunneling Shield Construction Technology
(065000) China Oil Pipeline Bureau No.4 Engineering Corporation
Gao Jianguo
Abstract
This article introduces silo construction, annulus production, operating principle of AVN2440 turbid water balance shield, and shield construction technology under geologic condition of mudstone and pebble in Yichang Changjiang tunneling project.
Keywords: Changjiang tunnel, slurry balance shield, mudstone and pebble geology, shield construction technology
1. General situation of Yichang Changjiang tunneling project
Yichang Changjiang tunnel is one of Zhong-Wu gas pipeline control projects, located within Yichang City Honghuatao- Yunchi River section, and 4Km away from Honghuatao Town. The tunnel is 1400m long, with internal diameter Φ 2440mm. Project including: launch shaft, arrival shaft construction; 1400 annulus (6 pieces every annulus); Shield tunnel 1400m.
Main geologic features of the tunnel: 0-900m mainly for clay siltstone; 900-1400m mainly for high permeability pebble bed. Geologic description see fig. 1.
Fig. 1: Geologic description of Yichang Changjiang tunneling project
2. Silo construction technology
Silo project includes launch shaft, arrival shaft and other ancillary silo works. Silo consists of surface casing shaft and drop shaft, surface casing shaft is 7.06m deep, outside diameter 11.5m, internal diameter 10.3m; drop shaft is outside diameter 8.7m, internal diameter 7.5m; launch shaft is 48.4m deep and arrival shaft is 22.4m deep. According to geologic condition, launch shaft adopts drop shaft and drilling process; Arrival shaft adopts drop shaft process.
Silo process flow
2.1.1 Silo construction process mainly includes:
Surface casing shaft making and installation
Silo making and installation
Silo sinkage
Silo subseal
2.1.2 Silo process chart
Survey positioning- payingoff install casing shaft shoe casing shaft concreting
Erect casing shaft formwor