世行贷款辽宁省中等城市基础设施项目-Worldbankdocuments.doc

世行贷款辽宁省中等城市基础设施项目-Worldbankdocuments.doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
世行贷款辽宁省中等城市基础设施项目-Worldbankdocuments

Liaoning Third Medium Cities Infrastructure Project Procurement Plan General Project information: Country: The People’s Republic of China Borrower: The People’s Republic of China Project Name: Liaoning Third Medium Cities Infrastructure Project Loan Number: 7524-CHA Project Implementing Agency (PIA): Liaoning Foreign Fund Utilization Project Office Bank’s approval Date of the procurement Plan [Previous Version: May 29, 2014, Updated Version: December 24, 2014] Date of General Procurement Notice: Jan. 4, 2008 Period covered by this procurement plan: 2015 II. Goods and Works. Prior Review Threshold: Procurement Category Procurement Threshold Procurement Method Prior Review Thresholds (no change as specified in LA) Civil Works ≥US$40 million ICB All US$40 million NCB ≥ USD 10 million and the first contract of each PIU US$200,000 Shopping N/A Goods including Supply and Installation ≥US$10 million ICB All US$10 million NCB ≥ USD 1.0 million and the first contract of each PIU US$100,000 Shopping N/A Procurement Packages with Methods and Time Schedule Bo. Contract/ Package Contract Description Contract Number Contract Type Proc. Method Prior-or Post- review Bidding period Prequalifi cation Period of Implementation Total Cost Million $ Total Cost Million RMB Actual Contract Value (RMB) A1 Yingkou Dashiqiao Heating Civil Works 1 Primary network/substations of Central Heat Source Pre-insulated pipe DN25- 900mm29900m; 43substation(0.0023-0.3537 million m2 heating area) including 12 building level substations Pre-insulated pipe DN200- 300mm5033m; 27substations (0.0023-0.3537 million m2 heating area) YKDHC-1 C NCB Prior review Mar .to June 2008 (Completed) No July to Novt.2008 5.405 45,683,288.69 2 Central Heat Source Plant 4×64 MW heat source plant YKDHC-2 C NCB Prior review Mar. to June. 2008 (Completed) No July to Oct.2008 4.936 43,987,879 Equipments/Material 3 Substation Equipment and Installation 4

文档评论(0)

170****0571 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档