- 1、本文档共55页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
樊学油区樊丙联合站设计论文-大学本科论文
樊学油区樊丙联合站设计
摘要樊学油区联合站拟建于地处定边县和吴旗县境内的定边采油厂樊学油区。该地区属陕北黄土塬区,由沟、墚、茆地形组成,地面海拔1400~1730m。联合站可建在梁弯东1km处,史家山西南侧的半山上。该区域地势平坦,交通方便。
站外来油经加热炉三相分离器首先进行油、气、水的分离稳定塔经外输泵和计量间等向外输送。站内气体直接送往气体处理厂进行处理。
站内划分为油罐区,污水处理区,工艺区,配电区,消防区,辅助生产区,设计时设计了有泵流程,同时也考虑了停电流程,即事故流程。
根据任务书所给该站的处理量和各种设计参数,首先初步选择了各工艺段设备,接着确定了总平面布置和联合站的工艺流程。完成了站内的水力、热力计算以及三相分离器、加热炉的选型和校核,并进行了罐区计算,选取了浮顶油罐;接下来绘制了联合站平面布置图,联合站工艺流程图;之后又进行了站内管线的选取,以及外输泵和脱水泵的选取。最后设计并画了阀组间安装图。
关键词联合站;油气分离;工艺流程;平面布置;泵房安装
Designing of Fan C multi-purpose station in Fanxue oil region
AbstractFanxue?C?central?oil?and?gas?treating?station?will?be?built?in?Fanxue?oil?region?of?Dingbian?oil?production?plant,?which?is?located?partly?in?Wuqi?County?and?Dingbian?County,?Sh-aanxi?province.?The?physiognomy?of?Fanxue?oil?region?is?loess?table?land?with?altitude?from?1400m?to?1730m,?which?is?consisted?with?loess?ravine,?loess?ridge?and?loess?hill.?Fanxue?B?station?is?proposed?to?build?in?a?flat?area?of?200x85m?in?the?south?side?halfway?up?the?Shijia?mountainside,?1?km?from?Liangwan?village.?The?transportation?of?this?area?is?relatively?convenient.
Oil from outside of the station is heated by the furnace, then after the first three-phase separator for oil, gas and water separation, followed by stability and stability of crude oil tower, and finally measured by the offloading pumps and other outward transport between 。Gas in the station is sent to the gas processing plant for processing.
Station area is divided into tanks, sewage treatment area, craft area, distribution area, fire zone, auxiliary production area, designed with the pump design flow, taking into account the power flow, the accident process.
According to the mission statement of the capacity of the station and a variety of design parameters, the first section of the initial selection of the various process equipment, and then determine the general layout and joint station process. Completed station hydraulic, thermal calculations, and three-phase separator, oil separators, electric dehydrator, selec
您可能关注的文档
最近下载
- 2022-2023学年贵州省毕节市威宁县七年级(下)期末语文试卷(含解析).docx
- 2015版ISO9001&ISO14001&ISO45001三体系管理手册及程序文件一整套.doc
- NY∕T 1973-2021 水溶肥料 水不溶物含量和pH的测定.pdf
- 赵绍琴临床经验辑要.doc
- 垃圾填埋场资料.docx
- (正式版)BT 44026-2024 预制舱式锂离子电池储能系统技术规范.docx VIP
- 2024年湖北省武汉市中考语文试题卷(含答案).docx
- 专题12 阅读理解说明文-(2019年-2023年)高考英语真题汇编(全解全析).docx
- 高教社马工程人力资源管理教学课件unit 6.pptx
- 哈曼JBL Authentics 300 便携式智能家用扬声器,可连接 Wi-Fi、蓝牙,可访问语音助手,采用复古设计。 用户手册 (中国)说明书.pdf
文档评论(0)