2012年二级建造师建筑工程管理与实务真题及答案(国外英文资料).doc

2012年二级建造师建筑工程管理与实务真题及答案(国外英文资料).doc

  1. 1、本文档共24页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2012年二级建造师建筑工程管理与实务真题及答案(国外英文资料)

2012年二级建造师建筑工程管理与实务真题及答案(国外英文资料) In 2012 two construction division of construction project management and practice Zhenti and answers A single choice. (a total of 20. 1 points for each question. Each question in options. Only 1 of the most to do) 1. pieces of anti permeability concrete test block group (D). A. three B. four C. five D. six 2. each of the following options. Cross section of the beam damage form is the biggest impact (D) A. concrete strength B. section C. stirrup D. reinforcement ratio The following 3. elements. Just belongs to the harmful components is (B). A. carbon B. sulfur C. silicon Manganese D. About 4. of slotconstruction approach (B) is correct. A. pouring the original structure and the same level of concrete B. pouring improve micro expansion concrete level than the original structure C. then rub parts of chiseling directly pouring concrete D. after pouring formwork support re erected after pouring concrete About 5. reinforced connection (A) is correct. A. welding B. common bolt connection C. rivet D. high strength bolt connection 6.. The following materials do not belong to the common building mortar cementitious material is (C). A. lime B. cement C. fly ash D. gypsum 7. on the construction of masonry structure. The error is (D). A. construction site block stacking height 1.9m neatly stacked. B. at room temperature under the condition of masonry brick masonry. In 2D water The level of C. ash brick masonry joint thickness is 11mm The indwelling time D. must break into straight rub 8. welding steel structure. The arc is component (D). The main component of A. B. secondary component C. connection board D. version of the arc The 9. winter embankment construction. Thickness of soil layers should be higher than the normal temperature (B). The increase of A. 20~25% B. reduced 20~25% C. reduced 35~40% The increase of D. 35~40% 10-17 no problem 18. the main building structure engineering quality acceptance. The following statement is wrong (D). A. th

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档