- 1、本文档共33页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
AWOS 题目20070323(问答题)(国外英文资料)
AWOS 题问答题)(国外英文资料)
On the working principle of Grohe cloud.
The ceilometer transmitter emits a beam of light pulse to pulse, sent from the transmitter, the cloud base after reflected by the receiving terminal detected by measuring the optical signal from transmitter to be received by the time required to determine the height of the cloud. Because the moment the intensity of the returned signal reflects the reflectance of the corresponding altitude, so from the return signal, you can get on the cloud, fog, rain and other information.
The reflective layer height of H = C*T/2 (C is the speed of light, T time)
Five
Two
Grohe CT12K cloud transmitter including what the main components?
Including high voltage rectifier, laser diode, laser diode trigger circuit.
Five
One
Please draw the block diagram of the CT12K Grohe cloud transmitter.
[see CT12K Grohe cloud technology manual answer. From diagram that entry]
Five
Two
Grohe CT12K cloud receiver including what the main components?
The receiving photodiode, high voltage power supply, filter, I-U conversion pre amplifier.
Five
One
Electronic circuit CT12K Grohe cloud processing board CTM12 according to the function which can be divided into 4 main parts?
Part CPU, part of the monitor, the sequence control part, amplifier section.
Five
One
Grohe CT12K cloud monitor board two photosensitive diode plays what role?
One is used to monitor the laser frequency, a surveillance sky background noise.
Five
One
The laser pulse generated by the Grohe CT12K cloud what parts, by what?
Produced by the transmitter board CTT12, GaAs laser diode laser treatment in the control board under the laser pulse trigger signal.
Five
Two
The calibration step on the Grohes CT12K cloud.
Black, non reflective cloth will completely cover the transmitter window ceilometer, connected to a portable computer, even in the PCPLUS program execution machine:
AUTO OFF
GAIN 0
LASE ON
SEQ ON
240 CAL four minutes after the completion of the automatic calibrati
您可能关注的文档
- 2014年度职业卫生复习题(国外英文资料).doc
- 2014年德国国际制冷、空调、通风博览会(国外英文资料).doc
- 2014年注册暖通工程师考试真题答案(国外英文资料).doc
- 2014年财科所财政学考研过来人分享他的考研路(国外英文资料).doc
- 2014年秋季计算机应用基础(本)网上作业1(国外英文资料).doc
- 2014最新机械毕业设计课题列表(国外英文资料).doc
- 2015年普法读本练习题 一(国外英文资料).doc
- 2015年清华大学清华视觉传达考研经验分享(国外英文资料).doc
- 2015年清华大学风景园林硕士考研经验分享(国外英文资料).doc
- 2014香港标杆房企住宅、豪宅、别墅及商业地产考察(9月26-28日)(国外英文资料).doc
最近下载
- HG╱T 3655-2012 紫外光(UV)固化木器涂料.pdf
- 人民警察警示教育观看心得.docx VIP
- Q-GDW-智能变电站辅助控制系统设计技术规范.pdf
- 外教社2023中国文化英语综合教程 上册 Unit 3 PPT课件(试用版).pptx
- 乡镇临床执业助理医师:甲状腺功能亢进症考试题.docx VIP
- 冀教版七年级上册数学《角的大小》教学说课研讨课件复习.pptx VIP
- 全国智能制造应用技术技能竞赛题及答案.doc VIP
- 智慧园区管理平台建设方案.pdf
- XX职业技术学院关于大数据与会计专业实习的实施方案.docx
- GBT 50034-2024 建筑照明设计标准.docx VIP
文档评论(0)