二级建造师(国外英文资料).doc

  1. 1、本文档共18页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
二级建造师(国外英文资料)

二级建造师(国外英文资料) In the high school Classification and construction points of subgrade drainage 6. classification of subgrade drainage and construction points (1) classification: surface drainage and underground drainage. The surface drainage ditches, drainage ditches, drainage ditch, drop and chute, stop water, evaporation ponds and other facilities; underground drainage facilities and drainage ditch, ditch (canal), sewer, seepage wells, inspection wells (2) surface drainage facilities construction points: 1) is arranged on the side ditch excavation sections and low embankment section 2) should first cut ditch construction, and other drainage facilities should be smooth convergence. Cut ditch length of more than 500m should choose the appropriate location. The outlet, when necessary, or setting the drainage water chute 3) drop and chute: water flow through the slope is greater than 10%, the head height difference is greater than 1 The steep slope of M, or special scarp area, should be set up or drop chute. Chute section length should be 5 ~ l0m, the joint application of waterproof material filling (3) construction of underground drainage facilities: 1) ditch ditch must be embedded into the impervious layer within the trench wall, a row of minimum water penetration holes should be higher than the ditch at least 200mm ditch the longitudinal slope of the channel bottom should be greater than 1%, the poor condition of the longitudinal slope of the channel bottom should be greater than 0. 5%, the outlet should increase the longitudinal slope, and higher surface drainage ditch water above 200mm. 2) a stone ditch, ditch three forms of pipe ditch and hole type sewer. Stone ditch longitudinal slope is less than l%. The outlet of the bottom elevation should be higher than the highest water level outside the ditch 200mm. Ditch shall be excavated from downstream to upstream, the excavation surface shall be selected according to the soil supporting form reasonable, and should be c

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档