- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
二级建造师学习资料(国外英文资料)
二级建造师学习资料(国外英文资料)
A RadioButtonList, 1. on the asphalt mixture construction technology requirements, the following statement is wrong (A) Asphalt Mixture Compaction thickness of each layer, should not be less than the aggregate nominal maximum size of 2.5 to 3 times. The most important B asphalt concrete pavement repair should be 100 ~ 200m test section, the main points the trial mix, test at two stages, to obtain the corresponding parameters. The end of C hot mix asphalt pavement construction after natural cooling, the surface temperature is lower than 600C, can allow the vehicles to pass. D hot mix asphalt layer and the adjacent two spoke horizontal construction joints should be staggered over 1m. Answer: C Analysis: when the mixture of high temperature of the surface of the opening, easy to form a rut. 2, the city main road, on the road, in the surface layer of asphalt mixture through the test (test, rutting resistance, dynamic stability index is A Marshall. Answer: B analysis:. Temperature stability test mixture under high temperature in the summer season, should do the rutting test. 3. city trunk road, expressway construction temperature of hot mix asphalt (below, not construction. Answer: D B.18 A.15 C 12 D.10) 0 C B. C. D high temperature rutting compressive strength bending)
Analysis: the construction of asphalt pavement at low temperature, prone to compaction of asphalt pavement early enough, cracking, etc. over 4. diseases. The quality of hot mix asphalt mixture paving the echelon form during the operation of longitudinal joints should be used. The upper and lower heat joints should be staggered longitudinal seam (above A.50mm). Answer: B the upper and lower longitudinal joints staggered, mainly to avoid reflection cracks. The 5. city expressway, trunk road asphalt concrete mixture should be used (A continuous mixing. Answer: B analysis: intermittent line with Chinas national conditions, can guarantee the mixing quality. Chinas stone factory for collective
您可能关注的文档
- 世界是大纲(国外英文资料).doc
- 世界现代前期科技史二(国外英文资料).doc
- 世界英雄完美版出招表(国外英文资料).doc
- 世界知名的食品企业(国外英文资料).doc
- 世界著名的女性摄影师介绍(国外英文资料).doc
- 世界风景名胜纵览之古巴(国外英文资料).doc
- 丙烯酸精制工艺流程(国外英文资料).doc
- 丛文俊先生谈篆隶书学习(国外英文资料).doc
- 东北大学15春学期《计算机基础》在线作业3(国外英文资料).doc
- 东南亚风味(国外英文资料).doc
- 第12课 大一统王朝的巩固 课件(20张ppt).pptx
- 第17课 君主立宪制的英国 课件.pptx
- 第6课 戊戌变法 课件(22张ppt).pptx
- 第三章 物态变化 第2节_熔化和凝固_课件 (共46张ppt) 人教版(2024) 八年级上册.pptx
- 第三章 物态变化 第5节_跨学科实践:探索厨房中的物态变化问题_课件 (共28张ppt) 人教版(2024) 八年级上册.pptx
- 2025年山东省中考英语一轮复习外研版九年级上册.教材核心考点精讲精练(61页,含答案).docx
- 2025年山东省中考英语一轮复习(鲁教版)教材核心讲练六年级上册(24页,含答案).docx
- 第12课近代战争与西方文化的扩张 课件(共48张ppt)1.pptx
- 第11课 西汉建立和“文景之治” 课件(共17张ppt)1.pptx
- 唱歌 跳绳课件(共15张ppt内嵌音频)人音版(简谱)(2024)音乐一年级上册第三单元 快乐的一天1.pptx
文档评论(0)