地下室漏水维修防水施工方案(国外英文资料).doc

地下室漏水维修防水施工方案(国外英文资料).doc

  1. 1、本文档共18页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地下室漏水维修防水施工方案(国外英文资料)

地下室漏水维修防水施工方案(国外英文资料) I. General Situation of the project Two, the basis for program preparation Three, crack leakage treatment program Four, large area (honeycomb) leakage treatment program Five, little holes, embedded parts, wall permeability, pipeline leakage control scheme Six, other large wall waterproof Seven, main waterproof plugging material performance Eight, the main waterproof plugging equipment Nine, waterproof plugging material reference Ten 、 construction organization and staffing Eleven construction schedule cycle Twelve, safety measures Thirteen 、 quality standard of plugging Engineering Fourteen, waterproof plugging construction matters needing attention Fifteen, service commitments Sixteen, payment method Seventeen, annex I. General Situation of the project Located on the Jade Road Administrative District basement beach serious Water Leakage, through on-site investigation, the project belongs to the basement waterproof: praise degree, depth of 6--7 meters, an area of about 800m2, irregular beach due to the underground complex structure, arranged in a crisscross pattern, large area, stress area is uneven, causing varying degrees of subsidence, so that building the following situations: 1., there is a large pool of water, unable to determine the source of water 2. there are different turtle cracks and temperature cracks on the wall of the bathing pool, and there is obvious watermark or water seepage in different degrees 3. there is a clear drain on the bathing pool, which is suspected of leaking. The above situation brings great risk to the project, so we must take effective measures of waterproof plugging fast as soon as possible, make the basement bath to meet the requirements of good construction, to meet the needs of the next step of construction and use requirements. Two, the basis for program preparation 2. National standard GB50208-2002 code for waterproof construction and acceptance of underground works 3, the national building materials indu

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档